Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Pile Design and Construction Challenges in Partially Thawed Alaskan Soils (f9ca4371-20bf-4196-a495-4aa1bd15a8c0)By John D. Thornley
Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alask
Jan 1, 2017
-
Case Histories of Arch Action Low Improvement Ratio Cement Column Method (ALiCC Method)By Jun Ohbayashi, Yoshiyuki Yagiura, Hiroaki Miyatake, Masuo Kondoh, Naotoshi Shinkawa
"Reducing the improvement ratio of ground improvement is an extremely efficient way to reduce the construction cost and construction period of mitigation measures for soft ground. The Arch Action Low
Jan 1, 2015
-
Pile Design And Construction Challenges In Partially Thawed Alaskan SoilsBy John D. Thornley
Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alas
-
Very Deep Foundations in Rock: The New Challenge in the Foundation Industry.By Paolo Cavalcoli, Federico Pagliacci
"As opposed to the static functional recovery of existing structures, the construction of infrastructures in an urban environment, when combined with complex geological situations, often involves buil
Jan 1, 2015
-
Marine Foundation Retrofi t for the Richmond - San Rafael BridgeBy Patrick E. Durnal, Henrik Dahl
"A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM + Harris) designed the $779 million seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the
Jan 1, 2007
-
Equipment Installation - Recent Developments: General Report On 'Installation Equipments' ? 1 IntroductionBy A. Paviani
The subject of this session is "Equipment Installation, Recent Developments". This is a subject which is not usually addressed at conferences of Foundation Engineering. It is rare to find sessions
Jan 1, 1994
-
Practice Of Large Diameter Stepped Section Bored Pile Foundation Of A Deep Water BridgeBy Cen Guoji
The foundation of bored pouring concrete pile have been adopted in the bridge engineering of China since early in the sixties. They demonstrated tremendous technical advantage and achieved notable eco
Jan 1, 1991
-
Assessment Of Safe Load On Piles Using Indian Standard Codeprivate ? SynopsisBy Shenbaga R. Kaniraj
The pile loading tests are generally conducted to assess the safe load on piles in compression. In the Indian practice, the safe load is determined using the pile loading test data and the two criteri
Jan 1, 1996
-
Reflections on Tremie Concreting in Deep FoundationsBy Gilbert R. Tallard
"Pouring deep foundations by the tremie pipe method is nowadays such a common process that it has becomes an unspecified practice. Means and methods are almost entirely at the contactor’s discretion.
Jan 1, 2017
-
Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)By Dinesh Hinduja, Pérez: Miguel
"Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders
Jan 1, 2015
-
Bluestone Dam Safety Assurance Program: An OPA Runner UpBy Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
Impact Of Clay On Early Jet Grouting StrengthBy Debra F. Laefer
Jet grouting is a ground improvement technique that has become widely adopted over the past three decades, yet relatively little data has been published about performance characteristics of mixes unde
Jan 1, 2009
-
Shear Walls Used For Liquefaction Stabilization Of Earthen Dam EmbankmentsBy Peter J. Nicholson
Recognition of the liquefaction susceptibility of dam embankments has been heightened since the San Fernando Dam near failure incident in 1971. Both the downstream and upstream slopes of dams can be
Jan 1, 2008
-
Evaluation Of Ultimate Resistance Of Steel-Concrete Composite Drilled Shafts Through Static Loading TestsBy Moonkyung Chung
Static pile load tests were performed in order to evaluate bearing capacities and mechanical behaviors of three different pile types: (1) steel-concrete composite drilled shaft with rebar reinforcemen
Jan 1, 2010
-
A New Type Of Wave Equation Analysis ProgramBy Don C. Warrington
This paper describes a new wave equation analysis program called ZWAVE, which is a program specifically for external combustion hammers. The program is de-scribed in detail, the discussion dealing wit
Jan 1, 1988
-
Construction Dewatering Challenges in Urban EnvironmentsBy Rafael A. Rivera
"Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re
Jan 1, 2017
-
Nailed It! The Great Wall of the Chinese EmbassyBy Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
No. 1 Queens Road - Melbourne, AustraliaBy Tom George
"INTRODUCTIONNo. 1 Queens Rd was an existing 10-storey office building founded on large pad footings. This project involved the construction of a 6-level, 15m (50-ft.) deep basement excavated immediat
Jan 1, 2005
-
A Numerical Model For Load Transfer And Settlement Of Bored Cast In-Situ PilesBy Joshua R. Omer
A numerical model is developed for predicting the load transfer and settlement behaviour of vertically loaded, bored cast in-situ piles. Based on analysis of full-scale pile tests, closed-form equatio
Jan 1, 2010
-
Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a