Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Evaluating the Role of Water Tamping vs Pushing in Explosive Applications

    By Jeremiah Cohn, Rachel L. Bauer, Catherine E. Johnson

    Water is frequently used in explosive applications to increase explosive performance and reduce air overpressure. Water tamping can enhance cutting abilities of shaped charges in demolition and increa

    Jan 26, 2026

  • ISEE
    Journal: Kaiser Plant Demolition / Smokestack Demolition at port of Tacoma, Washington

    By Walt Meglasson

    The Kaiser Aluminum Company Smelter, one of several in the Pacific Northwest, was built in 1942 and operated by the Olin Company during World War II and then purchased by Kaiser Aluminum after the war

    Jan 1, 2008

  • ISEE
    Surveying the Damage: Post Traumatic Stress and Pre-Blast Surveys

    By Jeffrey Loeb

    Recent trends in blasting engineering and its related fields, at the level of professional academia, have tended to exclude detailed discussion and examination of the formative experiences of the engi

    Jan 1, 2009

  • ISEE
    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016

  • ISEE
    Success Case: Technical and Operational Assurance of Blasting Near Neighboring Mine Structures

    By Hector O. Romero, Paulo C. Fernández A, Claudio C. Gajardo

    Phase 06 of the Los Bronces mine, currently under extraction for development, has the particularity of being close to the installations and buildings of a neighboring copper mine. Therefore, the blast

    Jan 21, 2025

  • ISEE
    Journal: Haz Mat 101 / PART 3

    By Tom Snyder, John Brulia

    PART 3 – UN Identifi cation Markings for the Highway Transportation in Commerce of Bulk Explosives, Oxidizers, and Combustible Liquids

    Jan 1, 2015

  • ISEE
    Believe it or Not: My Summer Internship as an Explosive Company Tech Rep

    By Jacqueline Berendzen

    Summer internships are a great way for students to explore different career paths in the industry and get first hand experiences with potential employers. As a junior in mining and explosive engineeri

    Jan 1, 2010

  • ISEE
    Effect of Explosive Charge Geometry on Shock Wave Propagation

    By Martin Langenderfer, Catherine Johnson, Phillip Mulligan, Kelly Williams

    The physical geometry of a charge has a direct correlation to the geometry of the shock wave. This relationship appears strongest within the boundaries of the visible fireball. As the shock wave propa

    Jan 1, 2018

  • ISEE
    Study of Sheet Charge Initiation with Varied Cap Type, Orientation, and Distance

    By C. E. Johnson, R. L. Bauer, E. M. Johnson

    In industry, the strength of a blasting cap is often equated to the type of explosive it can detonate. Comparable cap strength is becoming less important as nearly all caps manufactured today can init

    Feb 6, 2023

  • ISEE
    Plug Blast for a Powerhouse Intake Using an Unusual Technique

    By Terry Matts, Bruce Ripley, Clark Fletcher, Paul Rapp, Stan Holtby, Jim Dent

    The Stave Falls Project of BC Hydro, situated 65km east of Vancouver, BC, Canada, involved the construction of a new two-unit 9OMW hydro-electric facility to replace an existing powerhouse. The final

    Jan 1, 2000

  • ISEE
    A New Method of Shaft Sinking

    By John Cowin, Dan McCutchen

    Cowin & Company has specialized in underground construction since 1924. This paper reviews the sinking of two shafts in the Alabama coal fields using bulk-loaded explosives. Each shaft is eighteen hun

    Jan 1, 2000

  • ISEE
    The Recovery of a Dozer from a Highwall Using Blasting

    By Tyler Acorn, Tristan Worsey

    A dozer operator at a surface gold mine accidentally drove a D10 off the side of a highwall. The blade of the dozer caught on the lip of a catch bench 60 ft. (18.3 m), down stopping its descent. The o

    Jan 1, 2014

  • ISEE
    Unlocking the Wealth From Benefit Sharing in Drill and Blast

    By Lawrie Logan, Mike Wiggin

    This paper will be in two parts, a discussion of the benefits available from benefit sharing as a concept followed by an examination of how this approach was applied at Mesa J Mine and what improvemen

    Jan 1, 2001

  • ISEE
    Electromagnetic Characterization of an Explosives Mixing Site at Blackie, Alberta

    By David G. Paton

    "Electromagnetic surveys were conducted at the BXL Bulk Explosives Limited Mixing Plant andsurrounding area to characterize runoff from the site and possible impacts of salinity. The BXL Plant is loca

    Jan 1, 1999

  • ISEE
    Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant

    By Thierry Bernard, Philippe Dozohne

    May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate

    Jan 1, 2001

  • ISEE
    Journal: 100 Years / Dictionnaire de Chimie By Wurtz & Friedel / Safety And Efficiency in Mine Tunneling USBM Bulletin 57

    By John A. Davis, David W. Brunton

    (Excerpts, pp 157-160) The usual means of firing blasting charges, especially in tunnels and adits in the Western States, is by the use of a safety fuse. The term safety fuse originated from the fact

    Jan 1, 2015

  • ISEE
    Close-in Pipeline Trench Blasting – Why PipeBlast Does Not Work

    By N. Skopak, C. Aimone-Martin, J. Redyke, B. O. Meins

    PipeBlast is a spreadsheet-based calculator based on research conducted by Southwest Research Institute (SwRI), used by the pipeline industry to determine if proposed blasting planned near existing pi

    Jan 1, 2024

  • ISEE
    Development and Blast Applications for Resolution Copper's No. 10 Shaft

    By Tom Goodell, James Cox, Scott Scovira

    Resolution Copper Mining is sinking a 6943 foot (2116 m) deep shaft to access and develop a new panel caving mine with approximately 1.6 billion known tons of porphyry copper resource. This mine will

    Jan 1, 2014

  • ISEE
    Using Photogrammetry and UAVs for Pattern Optimization, Quantification, and Mapping

    By Tony Rorke, Tamara Wiseman

    Due to the advancements in technology it becomes easier to obtain accurate measurements for mining, quarry, and construction operations even in the most remote places. The use of off-the-shelf photogr

    Jan 1, 2015

  • ISEE
    Federal Blaster Certificate Program

    By Kenneth Eltschlager

    Blasting represents the highest risk of any surface coal mining activity that could result in injury and/or property damage off the permit area. In addition, blasting related issues e.g. flyrock, vibr

    Jan 1, 2010