Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023
By Basilio Giurgola, Jeremiah M. Jezerski, Filippo Azzara, Federico Bonaiuti, Russell H. Lutch
The Northeast Boundary Tunnel Project consists of a 23 ft diameter, 27,000 ft long, CSO tunnel, multiple underground connections, and significant surface works within an urban corridor. The NEBT align
Jun 13, 2023
-
A Comparison Of Environmental Permitting Requirements And Costs Chile And The Last Frontier
By R. T. Richins
Coeur d'Alene Mines Corporation (CDE) is a precious metals mining company. The company's three mining operations are located In Nevada and Idaho. Collectively, these mines (Rochester in Neva
Jan 1, 1993
-
Optimization of Surface Mining Dig Limits with a Practical Heuristic Algorithm Mining, Metallurgy and Exploration (e8f12701-6e05-4369-9a27-d2734d7cf05f)
By Y. V. Vasylchuk
This paper presents an algorithm for optimizing the classification of surface mine material subject to excavating constraints. High-resolution expected profit models are input and optimized to classif
-
Optimization of Surface Mining Dig Limits with a Practical Heuristic Algorithm Mining, Metallurgy and Exploration
By Y. V. Vasylchuk
This paper presents an algorithm for optimizing the classification of surface mine material subject to excavating constraints. High-resolution expected profit models are input and optimized to classif
-
A Case For Greater Involvement Of The United Nations In Third World Mineral Developments
By John S. Carman
Our industry is in trouble. Real trouble. It has never been an easy, secure business. But to-day it is engulfed in revolutionary currents. No longer can there be reliance upon the checks and balances
Jan 1, 1977
-
Interlude
If it had not been for the almost unbelievable adventures that came before and after, the last ten months of 19 15 would have been exciting enough for anyone. As it was they were a cheerful interlude.
Jan 1, 1976
-
Project Delivery Models and Risk Allocation for Whole Life Tunnel Management
By D. Caiden, C. S. Covil, P. J. Chamley
The paper describes the background to alternative delivery models, drawing on international experience, and introduces Project Alliancing/Contract Partnering, common risks and risk sharing on tunnel p
Jan 1, 2005
-
DC Water First Street Tunnel – Integrated Engineering and Construction
By Stephen Njoloma, Ivan Hee, Ravi Jain, Mina Shinouda
"INTRODUCTION DC Water’s First Street Tunnel (FST) is comprised of a collaborative effort between DC Water, DC Water’s Project Consultants Organization (PCO) led by Greeley & Hansen and McMillen Jacob
Jan 1, 2016
-
Simulation And Economic Evaluation Of Coal Combustion Residue Transportation And Handling Systems
By H. Sevim
Three transportation and handling alternatives for delivering dry coal combustion residues from power plants to underground coal mines were evaluated technically and economically. The objective was to
Jan 1, 1996
-
Strain energy considerations related to strata failure during caving operations
By Vasilis Androulakis, Caroline Gerwig, Zach Agioutantis
Mining operations that involve caving of the overlying strata are designed so that caving occurs in a controlled manner by progressive overburden failure. However, there are many cases where the overl
-
Annual Review 2001 – The United States 2001
By R. F. Balazik
By March 2001, shrinking global markets, reduced consumer spending and declines in domestic manufacturing and industrial output ended the longest economic expansion in US history and pushed the nation
Jan 1, 2002
-
Advance Exploration by Stochastic Inversion of Tunnel Seismic Waves - A Numerical Study
By Tamara Nestorovic, Luan T. Nguyen
"With the aim to mitigate excavation risks and reduce the costs caused by tunnel boring machine (TBM) stoppage when tunneling under uncertain soil conditions, prediction ahead of the tunnel face has b
Jan 1, 2016
-
Global Mining Standards Group: Enabling operational excellence through collaboration
The Global Mining Standards and Guidelines Group (GMSG) is building an international, multi-stakeholder community to advance the availability and use of standards and industry guidelines for the globa
Oct 1, 2013
-
Mining, EPA, and toxic waste : Will your mining company be liable?
By Peter Haller
Introduction The impact of the Comprehensive Environmental Response, Compensation, and Liability Act, or Superfund, as well as the Resource Conservation and Recovery Act (RCRA) and their state counte
Jan 2, 1987
-
Preliminary Design of the Caldecott Fourth Bore
By Bhaskar B. Thapa, Michael T. McRae, Johannes V. Greunen
This paper describes the preliminary design of the fourth bore of the Caldecott Tunnels along State Route 24 in Oakland, California. The paper focus is on two major aspects of the project: initial sup
Jan 1, 2007
-
Los Angeles Tunnels Are Expanded With Help Of TBM Monitoring System
During the last 20 years, more than 80 km (50 miles) of tunnels have been constructed in the Los Angeles, CA area. Recent projects include The East Central Interceptor Sewer (ECIS), completed in 2004
Jan 1, 2008
-
Prediction of Ground Vibration Induced Due to Single Hole Blast Using Explicit Dynamics Mining, Metallurgy and Exploration (5745d634-e632-4178-ad6f-441932595fe2)
By R. K. Sinha, B. S. Choudhary, Desh Deepak, A. K. Mishra, Hemant Agrawal, Shankar Kumar
There are several methods (empirical, statistical, and machine learning tools) to calculate blast-induced ground vibration. Still, due to complications in the blasting procedure, under varying blastin
-
Lysimeters allow quicker monitoring of heap leaching and tailing sites
By William R. Bond, Jim V. Rouse
Introduction The pressure/vacuum (p/v) lysimeter or soil water sampler has become useful for monitoring vadose zone or unsaturated zone water conditions. The soil water sampler was first introduced a
Jan 4, 1985
-
Exploratory Finite Element Analysis (FEA) And Conceptual Design Findings Of Large-Diameter, Segmentally Lined Shafts
By D. Kruse
Top-down constructed large-diameter (up to 90 m or 300 ft) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study co
Jan 1, 2011
-
Feasibility Analysis Of Wind Power As An Alternative Post-Mining Land Use In Appalachia
By A. Duerksen
Surface coal mining in West Virginia has supplied energy to the eastern coast of the United States for over a century. The coal mining industry has been forced to adapt as societal demands regarding h
Jan 1, 2012