Mine Production Scheduling Optimization At Newmont?s Twin Creeks Mine

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 4
- File Size:
- 286 KB
- Publication Date:
- Feb 27, 2013
Abstract
Newmont?s Twin Creeks Mine, located in northern Nevada, is producing gold ore from surface mining operations. The ore is currently processed at three different on site facilities depending on the ore type and the grade. The processing facilities operate under stringent geochemical blending constraints that must be met from mine ore deliveries and off site sourced ore. To analyze various strategic options, the technical team utilizes the mathematical optimization approach. However, due to the size and the complexity of the operation, there are unique challenges in optimizing life of mine production scheduling. This paper describes those challenges and the methodology developed to take advantage of different scheduling software systems that effectively compensate each other and result in reasonable guidance. The paper also describes how those scheduling results are reflected in detailed mine plan and cost estimate work.
Citation
APA: (2013) Mine Production Scheduling Optimization At Newmont?s Twin Creeks Mine
MLA: Mine Production Scheduling Optimization At Newmont?s Twin Creeks Mine. Society for Mining, Metallurgy & Exploration, 2013.