Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Analyses Of Dynamic Increasing Energy Load Test On Deep FoundationsBy Silvana B. Foá
Results from full-scale loading tests showed the use of the dynamic increasing energy test (DIET) to verify the capacity of deep foundations. This method allows the measurement of dynamic resistance -
Jan 1, 2002
-
Recent Experiences With Optical Fibre Monitoring Of Geotechnical StructuresBy Gust Van Lysebetten, Monika de Vos
The objectives of monitoring geotechnical structures can be very diverse, including optimisation of the design, quality control, long term performance assessment, and approval of innovative execution
May 1, 2022
-
Outline and Execution Control System of Dry Jet Mixing (DJM) MethodBy Shigetoyo Yasui, Masahiro Saitou, Nobushige Yasuoka, Keisuke Tsujimoto
"The Dry Jet Mixing (DJM) Method was developed and has been put to practical use on the initiative of the Public Works Research Institute and Japan Construction Method and Machinery Research Institute
Jan 1, 2015
-
Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)By Jeffrey M. Taylor, Arturo Ressi di Cervia
"Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con
Jan 1, 2004
-
Radium Hospital Project In Oslo, NorwayBy Wojciech Szczepiński, Dominik Gächter
In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau
Oct 1, 2021
-
Radium Hospital Project in Oslo, Norway.By Dominik Gächter, Wojciech Szczepiñski
In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau
Sep 8, 2021
-
High Capacity Hollow Core Bar PilesBy Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel
"A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry
Jan 1, 2017
-
Seismic Design for the I-30 Crossing Project in Little Rock, ArkansasBy David S. Graham, Benjamin Turner, Paul J. Axtell
Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an
Sep 8, 2021
-
Implementation of Kalman Filtering Techniques for Filtering CPT Cone Tip MeasurementsBy Gerald Verbeek, Erick Baziw
Cone penetration testing (CPT) is a popular and cost effective tool for geotechnical site characterization. CPT consists of pushing at a constant rate an electronic penetrometer into penetrable soils
Sep 8, 2021
-
Implementation Of Kalman Filtering Techniques For Filtering Cpt Cone Bearing MeasurementsBy Gerald Verbeek, Erick Baziw
Cone penetration testing (CPT) is a popular and cost effective tool for geotechnical site characterization. CPT consists of pushing at a constant rate an electronic penetrometer into penetrable soils
Oct 1, 2021
-
Installation Of Drilled Piers In Shales ? SynopsisBy A. C. Ackenhell
The geologic environment of Pittsburgh, Pennsylvania is both inviting and challenging to drilled pier installation. The shales and clayey soil zone of the hills are favorable but the alluvial soils of
Jan 1, 2010
-
Helical Pile Foundations at Tangier Island SubstationBy Jeff Wilkinson, Brandon Walter
"A&N Electrical Cooperative provides electrical service to the counties of Accomack and Northampton along Virginia’s Eastern Shore and to Smith Island in Somerset County, Md.A&N recently worked to imp
Jan 1, 2017
-
The Innovative CSM - Cutter Soil Mixing System for Constructing Retaining Walls and Cut-off WallsBy Erwin Stötzer, Renato Fiorotto, Wolfgang G. Brunner, Manfred Schöpf
"Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yie ld unsatisfa
Jan 1, 2005
-
Jet Grouting For Deep Excavation Support For Re-Entrant CornersBy Chu E. Ho
This paper reviews the design of jet grouting at re-entrant corners of excavations where the diaphragm wall and secant pile wall installation were interrupted by existing utilities in the streel sidew
May 1, 2022
-
“Special Application Of Micro-Piles” For The Construction Of A Bridge Well FoundationBy Nagarajkumar BV
Pavai-and TeampT JV started working on the project T49A, Sumbar J & K State as part of slope and earth stabilization for ongoing Banihal - Katra Railway Connection Project. This project has several tu
Nov 1, 2022
-
Installation of Secant Pile Wall in Rock Adjacent to Fragile BuildingBy Chu E. Ho, Alfredas Daugiala, Nicola Ebanks
"The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr
Jan 1, 2016
-
Soil Improvement Using Gravel-Sand Columns for a Highway Project in GermanyBy Schmitz Stefan, Stephan Jee-Sun
"Due to the reunion of Western and Eastern Germany in the late 80’s, a multitude of infrastructure projects had to be executed. A good portion of these projects required improvement of the motorway sy
Jan 1, 2015
-
A Collaborative Approach To The Design And Delivery Of The Most Heavily Loaded Piles Ever Constructed In The UkBy Morris J. D, Baldwin Z., Wiltcher P. M
21 Moorfields is an oversite development in central London spanning Moorgate tube station. It required the installation of both the highest loaded bearing piles and the highest top loaded static pile
-
Atoka Pipeline - Canadian River CrossingBy Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021