Abstract
"Due to the reunion of Western and Eastern Germany in the late 80’s, a multitude of infrastructure projects had to be executed. A good portion of these projects required improvement of the motorway system. In the southern region of Leipzig, in the eastern part of Germany, it was required to connect two existing motorways. Parts of the new motorway pass old strip mining areas. These strip mining areas consist of up to 70m thick backfill material. Especially the upper 20m are very inhomogeneous soil material with a very low bearing capacity. In order to increase the bearing capacity, to decrease the differential settlements and to homogenize the soil parameters, soil improvement using sand-gravel columns was required. Bauer Spezialtiefbau GmbH executed the installation of approx. 711,000 linear meters of columns with a length from 5 m to 25 m. For the project, 11 rigs with frame leads up to 40m were used to install the 43,000 columns with a diameter of 0.8m in 27 weeks.1. INTRODUCTION1.1 Site LocationThe construction site is located in the south-eastern part of Germany, in the south west of the city Leipzig.The area to be treated had a size of approx. 500,000 m² to allow the construction of dam/embankments and a highway bridge.1.2 Required WorkIn addition to the general earthworks and the installation of geogrids and fibre mats, a total amount of more than 710,000 linm of Gravel-Sand Columns with different lengths due to the given soil conditions had to be installed:•nos. 4,206 Columns length 5m ? 21,030 linm•nos. 4,581 Columns length 10m ? 45,810 linm•nos. 10,820 Columns length 15m ? 162,300 linm•nos. 19,634 Columns length 20m ? 392,680 linm•nos. 3,574 Columns length 25m ? 89,350 linmFor the installation of the columns Gravel-Sand with the grain size of 0/32mm was used. The total amount of Material was 580,000mt"
Citation
APA:
(2015) Soil Improvement Using Gravel-Sand Columns for a Highway Project in GermanyMLA: Soil Improvement Using Gravel-Sand Columns for a Highway Project in Germany. Deep Foundations Institute, 2015.