Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    A Field Study Of US Longwall Coal Mine Ventilation And Bleeder Performance

    By S. J. Schatzel

    Longwall coal mine operators in the US are required to ventilate multi-panel longwall districts but may have little or no knowledge about what happens to the ventilation air between the inlet evaluati

    Jan 1, 2011

  • SME
    Financial Evaluation and Risk Assessment of a Placer Gold Deposit during the First Stages of Exploration: A Case Study

    By D. Drymonitis, G. Gialoglou

    "Placer gold mineralizations have been observed in the north-eastern parts of Greece. Some of them have been at first evaluated to be of special interest so, exploration campaigns have been designed a

    Jan 1, 2005

  • SME
    New York Subway Caverns and Crossovers—A Tale of Trials and Tribulations

    By Charles Stone, Madan Naik, Drupad Desai, Karel Rossler

    Planning of New York’s new subway line dictated the location of shallow underground station caverns and track crossovers. Clear span openings ranging from70 feet to 100 feet and lengths in excess of 1

    Jan 1, 2005

  • SME
    Extensive Mechanization Produces Record Performance In Drill-Blast Tunnelling

    By Hans Hamrin

    Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed

    Jan 1, 1987

  • SME
    The 1990’s – Politics and the Environment

    By Georgene Renner

    At the beginning of the 1990s, Communism fell and signaled the end of the Cold War. The world rejoiced but also watched and waited to see how those countries would restructure themselves. The 1990

    Jan 1, 2007

  • SME
    Grouting And Freezing For Shaft Water Control In Milwaukee

    By Patrick J. Doig

    The contract for the construction of the Inline Pump Station for the Milwaukee Metropolitan Sewerage District involves the sinking of three shafts and the excavation of a pump chamber. The shafts a

    Jan 1, 1985

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • SME
    Handbook Provides Guidance in Selecting Excavators

    Several economic factors have caused the surface mining industry to require large-capacity shovels and trucks for efficient, high-production, low-cost operations. Some of those factors include techno

    Jan 1, 2003

  • SME
    The Selection Of Excavation Methods For The Detroit Upper Rouge Tunnel Cso Control Project

    By Jean Habimana

    Complex and distinct geological units spread along the 7-mile long 30-ft inside diameter Upper Rouge Tunnel CSO Control Project in Detroit, Michigan. Its construction is divided in two tunnel construc

  • SME
    Recovery Of Expanded Polystyrene From Coated Patterns Rejected From Lost Foam Casting (7e824799-4a95-4f4f-bb75-096af0709dc7)

    By J. Drelich, J. Pletka

    Lost foam casting patterns are foamed polystyrene shapes glued together into the shape of the part to be cast and are coated with a refractory material consisting of a mineral mixture and binders. Pr

    Jan 1, 2001

  • SME
    Large Flotation Cells In The Copper Processing Industry ? Recent Experiences And Future Considerations (Part 1)

    By D. Govender

    In recent years, economies of scale have continued to drive copper projects to larger throughputs to offset depleting lower grade resources. A decade ago there were only a small number of projects tha

    Feb 27, 2013

  • SME
    Viscosities Of Lead Silicate Slags (c9c81f49-9dac-42e2-b838-6d8b00a79267)

    By Z. Zhang, R. G. Reddy

    Viscosities of industrial lead slags with various compositions were measured as a function of temperature using a Brookfield viscometer. Based on the experimental data from this study and other invest

    Jan 1, 2001

  • SME
    Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project

    By James J. Kabat, James A. McDonald

    Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat

    Jan 1, 2007

  • SME
    Battle Mountain describes the geology of its Fortitude gold-silver deposit at Copper Canyon

    By R. G. Benson, P. R. Wotruba, K. W. Schmidt

    Introduction The Fortitude deposit is located in Nevada's Battle Mountain mining district in the central Great Basin region of the Basin and Range province of the western US. The deposit is at C

    Jan 7, 1986

  • SME
    Dewatering for the Lenox Avenue Subway Reconstruction Project

    By Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin

    The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr

    Jan 1, 2001

  • SME
    GIS and Bauxite Mining in Jamaica

    By Jim Baumann

    Deposited millions of years ago in irregular paleokarstic channels, Jamaica’s extensive bauxite deposits provide good quality ore for alumina production and subsequent aluminum smelting. Bauxite minin

    Jan 1, 2002

  • SME
    Hydrologic evaluation of post-closure flooding and dewatering of the Homestake Mine

    By Guosheng Zhan

    The Homestake Mine included the open cut and underground workings up to 2,484 m (8,150 ft) deep. The mine ceased mining activities in December 2001 after 125 years of operation. Pumping from the under

    Jan 4, 2010

  • SME
    Innovative Retaining Wall with Jet Grout for New Metro Tunnel Underneath Amsterdam Central Station

    By B. J. Schat, A. W. O. Bots, O. S. Langhorst

    Amsterdam City Council is building a new metro line, the North–South Line. The line passes under Amsterdam Central Station (a listed building) about 18m below street level. The retaining wall that has

    Jan 1, 2007

  • SME
    Geology of the Brewer Gold Mine in South Carolina

    By W. Scheetz

    The Brewer Gold Mine is an open-pit, heap leach operation that processes about 122 kt/m (135,000 stpm). The mine is operated by Brewer Gold Inc., a subsidiary of Westmont Mining Inc., and is located n

    Jan 1, 1991

  • SME
    Quarry Expansion – Sustainable Management of Natural Aggregate

    By M. L. Tucker, William H. Langer

    Many countries, provinces, territories and states in the European Union, Australia, Canada, the United States and elsewhere have begun implementing sustainability programs. Most of those programs, ho

    Jan 1, 2004