Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 417 KB
- Publication Date:
- Jan 1, 2007
Abstract
Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial materials under the Willamette River and downtown Portland, Oregon. This paper discusses alignment and geological conditions, equipment selection and plant setup, and tunnel excavation means and methods, parameters, and results. Extensive hyperbaric operations were required and will also be discussed.