Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project

Society for Mining, Metallurgy & Exploration
James A. McDonald James J. Kabat
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
13
File Size:
417 KB
Publication Date:
Jan 1, 2007

Abstract

Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial materials under the Willamette River and downtown Portland, Oregon. This paper discusses alignment and geological conditions, equipment selection and plant setup, and tunnel excavation means and methods, parameters, and results. Extensive hyperbaric operations were required and will also be discussed.
Citation

APA: James A. McDonald James J. Kabat  (2007)  Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project

MLA: James A. McDonald James J. Kabat Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project. Society for Mining, Metallurgy & Exploration, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account