Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation Subcontractors

    By Alexander Filotti, Richard Kalson

    "1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti

    Jan 1, 2017

  • DFI
    Soil Nail Design Optimization of 100 Ft Deep Excavation Project in San Diego, CA

    By Babak Mamaqani, Pirooz Barar

    The Heights project was located at Fashion Valley North, San Diego, CA. The scope of the project was to replace two existing commercial buildings with a large 7-story multi-family residential building

    Sep 8, 2021

  • DFI
    Liner Piles Used As Support To Kentledge For Initial Compression Load Test

    By Venugopal B, M Kumaran, Thomas John, Vetriselvan A

    The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t

    Nov 1, 2022

  • DFI
    Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct Comparison

    By Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL

    Sep 8, 2021

  • DFI
    Non-Destructive Testing, Evaluation And Re-Use Of Deep Foundations Along The East Coast

    By Matthew E. Meyer

    Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems

    Jan 1, 2009

  • DFI
    Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, Dc

    By Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey

    Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and

    Oct 1, 2022

  • DFI
    Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction

    By Aaron Evans, Chu E. Ho, Tom Richards

    "This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet

    Jan 1, 2016

  • DFI
    Performance of Large-Diameter Bored Pile Socketed In Sandstone and Siltstone in Thailand

    By Zaw Zaw Aye, Sereyroath Chea, Nutthapon Thasnanipan, Thayanan Boonyarak

    "As there are only limited numbers of bored pile constructed in sandstone and siltstone in Thailand, load transfer and settlement behavior of a pile in these rocks are still not fully understood. Majo

    Jan 1, 1900

  • DFI
    Evolving Micropiles: Optimizing Foundations For Seismic Retrofit

    By Rob Jameson

    Micropiles are ideally suited to seismic retrofit applications. Their high tensile and compressive capacity can sustain the large concentrated loads induced during seismic events. Micropiles can be

    Jan 1, 2008

  • DFI
    Rock Socket Capacity Certification Using the Point Load Index Test

    By Burt G. Look, David W. Lacey

    "Certification of foundation capacity during the construction phase is often assessed by strength or weathering state descriptors based on visual observations. This case study used the Point Load Inde

    Jan 1, 1900

  • DFI
    Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 Walton

    By Joel B. Dellaria, Justin R. Lewis

    "No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca

    Jan 1, 2017

  • DFI
    A Digital Twin For Deep Vibro Ground Improvement

    By Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter

    This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit

    May 1, 2022

  • DFI
    Installation Effects of Drilled Screw Pile In Soft Clay

    By Jianhua Wang, Jianming Yao, Zhen Meng, Jinjian Chen

    "Drilled screw pile is a newly developed displacement pile foundation which has been applied in soft clay for many years. Compared with traditional circular displacement pile, It is characterized by h

    Jan 1, 2015

  • DFI
    Goethals Bridge Replacement Foundation Design Modifications Due to Field Conditions

    By John P. Turner, Mark Jen, Bobby Daita

    "The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-

    Jan 1, 2016

  • DFI
    Installation of Secant Pile Wall in Rock Adjacent to Fragile Building

    By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks

    "The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr

    Jan 1, 2016

  • DFI
    Automated Pile Load Test Monitoring

    By Joel L. Volterra

    Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site

    Jan 1, 2008

  • DFI
    Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, Victoria

    By Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan

    The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an

    Nov 1, 2022

  • DFI
    Assessment of Existing Bulkhead Walls for Dredging Impacts

    By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst

    "For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen

    Jan 1, 2017

  • DFI
    Comparison of Load Test Results between ACIP Piles Installed in Sand in Pre-Drilled Holes versus Conventional Installation

    By Tracy Brettmann, Shailendra Endley, Jason Leary, Shashank Valluru

    "Augered Cast-in-Place (ACIP) piles have long been used for deep foundation support in sands due to their high capacity and speed of installation. Very little information exists on the effects on capa

    Jan 1, 2017

  • DFI
    Load-Deformation Based Design of Deep Mixing for Supporting MSE Walls at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li

    "Detailed design of an extensive deep mixing (DM) scheme using the Cutter Soil Mixing (CSM) technique was completed for foundation support of mechanically stabilized earth (MSE) walls for Kitimat Liqu

    Jan 1, 2015