Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An In-Situ Model Test For A Large Hydraulic Press Foundation ? SynopsisBy R. J. Yan
There was a plant equipped with a 32000t Hydraulic Press to be built, under which a box foundation of 22.5m x 15m x 14.25m (depth) with a base slab of, varying thickness was proposed. The subgrade rea
Jan 1, 2010
-
Comparison of LRFD Resistance Factors to Tension Pile Load TestsBy Seth H. Hamblin, John E. Regan, Dimitrios Palantzas
"Through reliability-based calibration of larger pile load test databases, recent developments of the Load Resistance Factor Design (LRFD) methods, which include geotechnical load and resistance facto
Jan 1, 2015
-
House & Commercial Building Foundation - Introduction & HistoryBy Roger A. Bullivant
As the UK's foremost domestic foundation underpinning contractor over the last 25 years it has become abundantly clear that the size of the repair market, some £500m per annum is a significant wa
Jan 1, 1995
-
Dynamic Pile Monitoring For Offshore Pile AcceptanceBy Scott Webster
Dynamic pile Monitoring Services (DMS) have been used for testing of offshore piles for several decades. However, most of this testing was to measure hammer performance and pile stresses rather than
Jan 1, 2010
-
Repair Methods For Corroded Steel PilesBy C. Vipulanandan
With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but als
-
Repair Methods for Corroded Steel Piles (0af709a8-9f1e-4f35-81ea-c69c3ee7fb05)By C. Vipulanandan, M. Dawood, Dongmei Pan
"With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but al
Jan 1, 2017
-
Residual Load Development Case Study In Driven Cast-In-Situ PilesBy Packer M. L
Residual load development in driven precast piles has been widely researched in recent decades, however, cast-in-situ piles are often falsely assumed to be unaffected by this mechanism. In contrast to
May 1, 2022
-
Historical Evolution Of Deep FoundationsBy Dean E. Matthews
The concept of a pile for construction is credited to a Neolithic tribe called the "Swiss Lake Dwellers" who lived in what is now Switzerland about 6,000 years ago. They used piling, not for supportin
Jan 1, 2003
-
-
-
Piling Adjacent To Rail Tunnels At King’S Cross CentralBy David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott
This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600
May 1, 2022
-
8000 Series Piling RigBy Roger A. Bullivant
The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar
Jan 1, 1995
-
-
Effects Of Change In The Support System On Temporary Secant Pile WallBy Anburaj C., Srinivas A.
Deep excavation with support system is required to construct various part of underground structures like shafts, stations and entry structures etc. These structures have to be constructed using perman
Nov 1, 2022
-
Consideration on Liquefaction Resistance of Ground Improved by the Sand Compaction Pile MethodBy Kazunori Matsushita, Masaru Sakakibara, Kenji Harada, Naotoshi Shinkawa, Mitsuo Nozu
The Sand Compaction Pile (SCP) method has been widely used as a typical countermeasure against liquefaction in Japan, and its effectiveness has been confirmed in many case histories of damages caused
Jan 1, 2017
-
Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test ResultsBy John C. Niedzielski
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)
-
SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction EventBy Richard T. Stain
"In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred
Jan 1, 2005
-
-
Estimation of Foundation Design Loads for Liquefaction Induced Lateral Spreads Using Strain Wedge MethodBy Jogeshwar P. Singh, Mohamed Ashour
The Soil-Foundation-Structure-Interaction (SFSI) problem involves Kinematic Soil- Foundation Interaction occurring during large (cyclic and permanent) ground deformations as well as Inertial Foundatio
Jan 1, 2015
-
SR167/70th Avenue East Vicinity Bridge Replacement ProjectBy Reda Mikhail, M. Birkan Bayrak
The Washington State Department of Transportation (WSDOT) State Route (SR) 167/70th Avenue East Vicinity Bridge Replacement Design-Build project is located in Fife, Washington. This $40 million projec
Sep 8, 2021