Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Analytical Expression for Plastic Hinge Length in Extended Pile-shaftsBy M. Hesham El Naggar, Mehdi Heidari
"Equivalent fixed-base cantilever model is a common approach for performance base seismic design of bridge structures supported by extended pile-shaft. In this method, global displacement ductility fa
Jan 1, 2017
-
Piled Rafts: Are We Modelling Them Correctly?By Jonathan J. Dewsbury
It is argued that approximate computer based methods are only suited to modelling conventional piled rafts, for pile enhanced rafts where the interactions will be non linear three dimensional finite e
Jan 1, 2010
-
A Field Study to Analyze Pile Setup Behavior and Comparison of Pile Capacity Methods from CPTBy Md. Nafiul Haque, Murad Y. Abu-Farsakh, Chris Nickel
"This paper presents the results from a pile load testing program for a bridge construction project in Louisiana. The testing includes two 54-inch open-ended spun cast concrete cylinder piles (OECP),
Jan 1, 2017
-
Rehabilitation of the Kölnbrein Dam / AustriaBy Frank Haehnig, Kurt Kogler
"With a height of 200 m, a crown width of 626 m and a concrete volume of 1.6 million m³, the Kölnbrein Dam in the upper Malta valley in Carinthia / Austria is the largest concrete dam in Austria. Boas
Jan 1, 2016
-
Design And Construction Of Shear Pins For Landslide StabilizationBy Fei-chiu Huang
A 17-acre landslide occurred in February 2001, on a slope below Via Bellota in the City of San Clemente, California. Three homes were destroyed and many others placed in jeopardy. The landslide, inv
Jan 1, 2010
-
Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA FinalistBy Bill Shea, Gordon King
"For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood
Jan 1, 2012
-
Design and Quality Control of Soil Mix Walls for Earth and Water Retaining StructuresBy Nicolas Denies, Jeroen de Leeuw, Bart Lameire, Jan Maertens, André Vervoort, Flip Hoefsloot, Noël Huybrechts, Flor De Cock
"In recent years, the Deep Mixing Method has increasingly been applied for the construction of earth and water retaining structures. From practice, it has been experienced that there is a real need to
Jan 1, 2015
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) MethodBy Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Analysis Of Pile Behavior In Granular Soils Using DEMBy Jeremy G. Kress
We propose the discrete element method (DEM) as a complimentary alternative to analytical solutions and FEM models for the analysis of pile response. DEM is a novel approach to the engineering design
Jan 1, 2010
-
Development of Fiber-Reinforced Soil Improvement Using CSM MethodBy Toshio Yonezawa, Helmut Florian, Herbert Kuh, Masamichi Aoki, Takao Koono, Franz-Werner Gerressen
"To increase the bearing capacity of the ground, soil improvement technique is often adopted. One advantage of soil improvement techniques is the fact, that the impact to the environment is low, as th
Jan 1, 2015
-
Cut-Off-Wall Welzow in the Lausitz, Germany, a 400 Feet (120 M) Deep Hydraulic Barrier between an Existing Lake Region and an Open Pit Coal MineBy Stephan Fisch, Franz-Werner Gerressen
"The use of cut-off-walls (COW) for the open pit coal mines has been used for decades. They have been used to reduce the negative hydraulic impact to the surrounding area caused by the open pit mining
Jan 1, 2017
-
Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train LoadingBy Pratik Goel, Sumanta Haldar
High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be opera
Sep 1, 2022
-
Meadowlands Megaproject: 9,000 Piles and CountingBy Ronald D. Boyer
"Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,
Jan 1, 2009
-
Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information SystemBy Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler
Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e
-
Geotechnical Assessment Of Highly Saline Soil Stabilized With Fly Ash - Cement AdmixturesBy Jahnavi Parmar, Pranav R. T Peddinti, Saloni Pandya, P. S. Prasad
Coastal cities are in desperate need of suitable land to meet the ever-increasing demand for urban infrastructure to support commercial, residential, tourism, and off-shore activities. Countries with
Sep 1, 2022
-
The Construction And Performance Of Post-Grouted Micro-Piles For Vancouver International Airport Domestic Terminal Building - IntroductionBy Ernest Naesgaard
Post-grouted micro-piles were used for the seismic upgrading of the Vancouver International Airport Domestic Terminal Building (DTB). The micro-piles provided vertical resistance to both uplift and c
Jan 1, 2004
-
A Combination of Jet Grouting and MPSP Grouting in Iskar River Cascade Hydropower Plant in BulgariaBy Massimo Poggio, Gabriele Balconi, Andrea M. R. Pettinaroli, Mario Ruggiero, Riccardo Castellanza
Grouting technologies are ground treatment techniques used for modifying the behaviour of a mass of soil or rock by injecting a mixture. The sleeved port pipes (also called Tube A Manchette) are highl
Jan 1, 2019
-
Stabilization of Materials – Upgrading Of Soils and Sediments to Use in Geo-ConstructionsBy Helene Kennedy, Josef Macsik, Yvonne Rogbeck, Gregory Makusa, Göran Holm
"Constructions activities in cities often imply large volumes of surplus material which could be treated by stabilization for re-use in new geotechnical constructions. Modification of dredged sediment
Jan 1, 2015
-
A 16 M Deep Basement Excavation in Kuala Lumpur Karst: Mixed Retention SolutionBy Serhat Baycan, Mikias Yohannes
"Kuala Lumpur Karst is a complex limestone formation that is characterized by presence of cavities, solution channels, pinnacles and floaters. Basement excavations in such geological formations are us
Jan 1, 1900
-
High Capacity Grouted Helical PilesBy Mohamed A. Mansour, Ahmed M. Soliman, M. H. El-Naggar
"Grouted helical piles allow significant increase in pile capacity with low additional cost over that of conventional helical piles. They can be particularly advantageous in sites where installation d
Jan 1, 2016