A Field Study to Analyze Pile Setup Behavior and Comparison of Pile Capacity Methods from CPT

Deep Foundations Institute
Md. Nafiul Haque Murad Y. Abu-Farsakh Chris Nickel
Organization:
Deep Foundations Institute
Pages:
11
File Size:
872 KB
Publication Date:
Jan 1, 2017

Abstract

"This paper presents the results from a pile load testing program for a bridge construction project in Louisiana. The testing includes two 54-inch open-ended spun cast concrete cylinder piles (OECP), one 30-inch open-ended steel pile (OESP), and two (30-inch and 16-inch) square prestressed concrete (PSC) piles driven at two locations with very similar soil conditions. All the test piles were instrumented with vibrating wire strain gauges to measure the load distribution along the length of the test piles and the skin friction and the end bearing were derived from strain gauge measurements. High strain dynamic load tests (HSDLT) were performed on all test piles at different times after pile installations to quantify the amount of setup with time. Static load tests were also performed on the PSC and open-ended steel piles. Due to expected large pile capacities, the statnamic test method was used on the two open-ended cylinder piles. The pile capacities of these piles were evaluated using various CPT methods (such as Schmertmann, De Ruiter and Beringen, LCPC, COFS methods). The result showed that all the methods can estimate the skin friction with good accuracy; but not the end-bearing capacity. Setup was observed for all the piles, which was mainly attributed to increase in skin frictions. The setup rate parameters “A” [The “A” parameter is defined as the rate of increase of pile capacity ratio (Rt/Rto) per log cycle of elapsed time] were back-calculated for all the test piles and the values were between 0.31 and 0.41.INTRODUCTIONDue to greater efficiency (capacity to weight ratio) of the pipe piles, open-ended piles are a viable option to solid piles. However, the behavior of open-ended piles is more complicated compared to the close-ended piles owing to possible formation of “soil plug” inside the open-ended pile. Many researchers have analyzed the behavior of both types of piles for different purposes; however, very few studies in the literature offer the side-by-side comparison of the close-ended and open-ended piles."
Citation

APA: Md. Nafiul Haque Murad Y. Abu-Farsakh Chris Nickel  (2017)  A Field Study to Analyze Pile Setup Behavior and Comparison of Pile Capacity Methods from CPT

MLA: Md. Nafiul Haque Murad Y. Abu-Farsakh Chris Nickel A Field Study to Analyze Pile Setup Behavior and Comparison of Pile Capacity Methods from CPT. Deep Foundations Institute, 2017.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account