Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train Loading

- Organization:
- Deep Foundations Institute
- Pages:
- 10
- File Size:
- 868 KB
- Publication Date:
- Sep 1, 2022
Abstract
High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be operating in India at about 320 kmph at an elevated track on a viaduct for most of the ongoing and upcoming corridors. High-speed projects in India necessitate an indigenous solution for design applications for viaduct design. Pile groups are extensively used in viaducts for high-speed trains, as they can be a settlement reducer and increase the bearing capacity. Post-construction settlement of pile foundation for high-speed railway viaduct is a concern of engineers. Limited attention has been paid to estimating the post-construction settlement. This paper aims to propose a prediction of the cumulative settlement of pile groups due to cyclic train loading. A three-dimensional finite element model (3D-FEM) of the pile group is established in Abaqus CAE. A suitable plastic model is used to simulate the subsoil. The pile group is modelled as an isotropic-elastic element. The study examines the influence of cyclic loading time and train speed on the settlement of the pile group. The analysis is carried out considering various single pile and pile group parameters like S/D, Ep/Es, L/D, Pile cap thickness, etc. and finally, an optimum configuration is suggested.
Citation
APA:
(2022) Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train LoadingMLA: Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train Loading. Deep Foundations Institute, 2022.