Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Control of sodium-rich brine inflows at Central Canada Potash - Part 2: Rock mechanics, instrumentation and results

    By E. M. De Souza, A. M. Coode

    "Since potash was discovered substantial rock mechanics research has been done to develop the technology needed to cope with the unique conditions in Saskatchewan mines, to assure general mine safety

    Jan 1, 1990

  • CIM
    Geostatistics and ore reserve classification

    By Roland Froidevaux

    "The main object of ore reserve classification is to assess the reliability of an ore reserve estimate. Because traditional classification schemes fail to provide a means of calculating this reliabili

    Jan 1, 1982

  • CIM
    Bituminous Sands of Alberta

    By S. C. Ells

    Introduction An investigation of the bituminous sands of Alberta was begun by the Mines Branch, Department of Mines, in 1913. This investigation was interrupted during the period 1916-19, but was r

    Jan 1, 1925

  • CIM
    The design and installation of a mine monitoring and control system

    By D. Lauzon, H. de Ruiter

    "In 1988a decision was taken to design and install a computerized mine monitoring and control system. This system had to monitor and control all pumping and ventilation underground. The operation of t

    Jan 1, 1991

  • CIM
    Optimal layout of underground mining levels

    By Jorgen Elbrond, Yve Lizotte

    "A mathematical procedure for determining the underground mining level layout which minimizes the total costs of excavation and haulage is described. This procedure has the advantage over previous gra

    Jan 1, 1985

  • CIM
    Deep-well dewatering at Gibraltar Mines

    By T. L. Carpenter

    "The presence of excessive water in the Gibraltar East Stage 1 pit initiated studies into the ground-water conditions that might be expected in mining the Granite Lake and Pollyanna pits. Hydrologic i

    Jan 1, 1980

  • CIM
    The practice of the sampling theory of broken ores

    By D. François-Bongareon

    "In previous publications by the author, significant advances and generalizations of the theory of sampling of broken ores, prompted and confirmed by experimental results, have been presented. This pa

    Jan 1, 1993

  • CIM
    The Need for a Mine Erosion and Sedimentation Control Plan Guidance Document for Exploration, Construction, Operation and Closure

    By J. Clark

    Erosion control during the mining cycle can be more effectively planned using Erosion and Sedimentation Control Plans (ESCPs). This raises the issue of who should develop an Erosion and Sedimentation

    Aug 1, 2013

  • CIM
    Geology and geochronometry of the Sclleelite Dome tungsten-bearing skarn property, Yukon Territory

    By R. L. Armstrong, C. I. Godwin, V. M. Kruan

    "The Scheelite Dome tungsten-bearing skarn property, central Yukon Territory, is in metasediments in contact with a quartz monzonite intrusion. Contact metamorphism to biotite-muscovite- andalusite ho

    Jan 1, 1982

  • CIM
    Pilot-plant data for the design of primary autogenous and semi-autogenous mills

    By C. A. Rowland

    "Plant owners and operators, plant designers and grinding mill manufacturers are giving much attention to the design and manufacture of autogenous and semi-autogenous grinding mills, particularly the

    Jan 1, 1981

  • CIM
    High-speed tracked drifting and materials handling

    By Julian Baldry

    "This paper begins by describing the parameters of high-speed underground tracked drifting operations and the mucking cycle, and-discusses their variations. The railbound Haggloader 8HR is then descri

    Jan 1, 1981

  • CIM
    Tire Maintenance at Scully Mine, Wabush

    By R. B. Anderson, N. J. Sherren

    The mining equipment at the Scully Mine, Wabush, consists of approximately twenty-five large haulage units, eight large dozer-loader applications and seventy other related pieces of service and mainte

    Jan 1, 1969

  • CIM
    Copper in the Eastern Townships

    By John A. Dresser

    Seventy years ago a period of prospecting and mining activity began in the Eastern Townships of Quebec that seems to have been quite equal to that of recent years in the Rouyn field. In the following

    Jan 1, 1928

  • CIM
    Analysis And Enhancement Of Cracking Resistance In Thermal Barrier Coatings By Functionally Graded Layers

    Thermal barrier coating (TBC) systems provide thermal insulation to high temperature for aero¬propulsion. A fracture mechanical model developed earlier for multilayer systems is applied on TBC to real

    Jan 1, 2010

  • CIM
    Uranium deposits of the Carswell structure

    By Roger T. Laine

    "The Carswell structure, located in the western part of the Athabasca Basin, northern Saskatchewan, has been extensively explored since 1967. This exploration has been successful and lead to the disco

    Jan 1, 1986

  • CIM
    Senator-Rouyn Mine

    By M. E. Wilson, A. C. Lee

    "The property owned by Senator-Rouyn Mines, Limited, is in Rouyn township about 17'2 miles southwest of the town of Rouyn. It adjoins the Chadbourne claims of Noranda Mines, Limited, on the south and

    Jan 1, 1954

  • CIM
    Anglo-American Responsibilities

    By Max W. Ball

    YOU have been kind enough to ask me to speak to you on "The War and Anglo-American Relations." A speaker always takes the liberty of putting his own interpretation on the scope of his subject. I am go

    Jan 1, 1941

  • CIM
    Teaching Geophysics in Canada

    The teaching of geophysics in Canada at the present time presents a variety of approaches to the subject, and the different paths adopted imply, in turn, an uncertainty in the minds of some educators

    Jan 1, 1951

  • CIM
    Morphology of Environmentally Assisted Cracks in Pipeline Steel

    The morphology of environmentally assisted cracks in stressed pipeline steel has been investigated, For a dilute and neutral solution (NS4) simulating ground water in contact with the steel, semi-elli

    Jan 1, 2005

  • CIM
    Morphology of Environmentally Assisted Cracks in Pipeline Steel (02425a31-82ac-48df-900e-2f0f4bebe2ef)

    By A. Plumtree

    The morphology of environmentally assisted cracks in stressed pipeline steel has been investigated. For a dilute and neutral solution (NS4) simulating ground water in contact with the steel, semi-elli

    Jan 1, 2005