Rion-Antirion Bridge - An Olympian Effort Overcomes Extreme GeohazardsBy Ricardo Dobry, Alain Pecker, George E. Leventis, Ralph B. Peck
"This year’s DFI Outstanding Project Award is for the design and construction of the foundation scheme for the largest cable-stayed bridge in the world. In 1993, Gefyra, SA (a French/Greek consortium
Jan 1, 2007
-
Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation SupportBy Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin
"Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated
Jan 1, 2016
-
Minipiles And Compaction Grouting For Seismic Retrofit Of Transportation Structures In The New Madrid Fault ZoneBy Steven D. Scherer
The highest earthquake risk in the United States east of the Rockies is along the New Madrid Fault System, which extends for 193 km (120 miles) through the Central Mississippi Valley from northeastern
Jan 1, 2001
-
Deep Excavation for Loop PitBy Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De
"This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t
Jan 1, 2015
-
Analysis of Three Axial Load Tests on Large Bored Grouted Deep FoundationsBy Hayel M. El-Naggar, Marawan M. Shahien
"Large capacity piles are important type of foundation elements that are needed in case of high column loads such as in tall buildings with large span between columns. In many projects, especially if
Jan 1, 2017
-
Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test ResultsBy John C. Niedzielski
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)
-
TTMJ – The New System for Slurry (Diaphragm) Wall JointsBy Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley
"TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-
Jan 1, 2017
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging ProjectBy José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015
-
Geophysical Methods for Site Characterization for Marine Foundations (2dc87bb8-7bfd-4523-92cd-c3dfe612556c)By Richard E. Sylwester
Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is prim
May 11, 2007
-
Simulation of Soil Plug Effects in Open Steel Pipe Piles Considering the Complex Soil-Structure-Interaction during InstallationBy Johannes Labenski, Christian Moormann, Johannes Aschrafi
"Open steel pipe piles are used for various applications in costal engineering, port structures and increasingly important for offshore structures. During the installation of open steel pipe piles the
Jan 1, 2017
-
Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, CanadaBy Shawna Munn, Carol Dounitch, Erika Acton
The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi
Oct 1, 2022
-
Commentary on the Selection, Design and Specifcation of Ground Improvement for Mitigation of Earthquake-Induced LiquefactionBy Ground Improvement Committee
The evaluation of earthquake-induced liquefaction has become a routine part of geotechnical engineering design. For a given project, if an analysis identifies a potential for liquefaction and the cons
Aug 1, 2013
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Applications of Nondestructive Testing Methods for Mass Foundation Blocks - Feasibility StudyBy Hamed Layssi, Farid Moradi, Thomas Tingson
This paper describes the feasibility and pilot study of of using existing non-destructive testing solutions for evaluating structural integrity and mechanical performance of mass concrete foundations.
Sep 8, 2021
-
“Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall ConstructionBy Thomas Domanski
Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent
Sep 1, 2022
-
Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont TowerBy Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich
"The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element
Jan 1, 2017
-
Pullout Capacity of Pile Groups in SandBy S. P. Mukherjee, Smita Tung
"Piles are generally subjected to uplift in case of under ground and water front structures. Sometimes piles are also to resist uplift loads in transmission towers, dry rock, and so on. Experimental i
Jan 1, 2015
-
Excessive Pile Breakage, Gaylord National Resort And Conference Center, A Look Back 15 Years LaterBy Karl A. Higgins
In August 2004, the long-awaited National Harbor project in the DC metro area sprang to life with the design of Gaylord National Resort and Convention Center. When the project was in its final stages
-
The Use of Controlled Modulus Column (CMC) Ground Improvement for Support of Large WarehousesBy Brandon T. Buschmeier, Sonia S. Swift, Michael P. Walker, Frederic Masse
"Ground improvement has undoubtedly become a cost-efficient and effective solution to support the development of poor soil sites. Ground improvement elements, such as Controlled Modulus Columns (CMCs)
Jan 1, 2017
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022