Stability Analysis Of A Rubble Mound Breakwater Resting On The Weak Seabed By 2D Finite Element ModellingBy Vijaya R, Boominathan A
The design of a rubble mound breakwater resting on a problematic seabed is quite challenging and expensive. In the present study, stage-wise construction of a typical section of the breakwater for a p
Sep 1, 2022
-
Improvements to Commonly Used Cutoff Wall SpecificationsBy Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea
"Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with
Jan 1, 2015
-
Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case HistoryBy Raffaella Granata, Daniele Vanni
"This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o
Jan 1, 2016
-
Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct ComparisonBy Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL
Sep 8, 2021
-
Safety Evaluation Of Adjoining Structures In Urban Areas During Deep Excavation: A Case Study Of Nagpur MetroBy Shreya Vivek Hokam, Dr. A. I. Dhatrak, S. W. Thakare, Dr. Vivek S. Hokam
Construction in congested urban areas has necessitated tall and massive structures. In urban areas, it is common to construct underground structure nearby existing buildings. Selection of an appropria
Sep 1, 2022
-
Instrumented Static Load Testing-Auger Cast-In-Place Piles - Introduction And PurposeBy Michael T. Lambert
The purpose of the this paper is to demonstrate the benefits of using additional instrumentation during load tests of auger-cast-in-place piles. Traditionally, only load and butt displacement are dete
Jan 1, 2000
-
Geotechnical Instrumentation of Pile Foundations Embedded In Molasse of a High-Rise BuildingBy A. Daouadji, P. Cazes, S. Grange, L. Briançon, R. Milane
Construction in congested urban areas is often accompanied by geotechnical problems due to high loads and the impact caused by nearby buildings. For this reason, it is important to understand the beha
Jan 1, 2019
-
The Development and State of Practice of Cutter Soil Mixing in North America – The First 10 YearsBy Brian Wilson, Franz-Werner Gerressen
"Cutter Soil Mixing, also known as CSM, was developed in Europe as an alternate method of Deep Mixing to the more traditional single and multiple auger techniques, and brought to market by Bauer Masch
Jan 1, 2015
-
Building Risk Assessment For Urban Rail Transit Systems In India - Current Practices And ChallengesBy Manchanda H, Agarwal J.
The construction industry has one of the largest numbers of injuries compared to other industries. Thus, reducing accidents and determining construction risks are extremely important. One of the essen
Sep 1, 2022
-
Soil Mixing for the LPV-111 Levee Improvements, New Orleans: A Case HistoryBy Filippo Maria Leoni, George Filz, Wesley Schmutzler, Matteo Bertoni
"The US Army Corps of Engineers selected the Deep Mixing Method (DMM) for the required stabilization at the LPV 111 Project (New Orleans, USA). DMM was used for ground improvement/foundation strengthe
Jan 1, 2015
-
Numerical Evaluation of Top of Rock Profile, Rock Strength and Conductivity.By Zhang Wengang, L. John Endicott
The properties of many geological materials are variable. This is especially true for variations in elevation of the top of rock profile, strength of weathered rock, and conductivity of rock masses. O
Jan 1, 2019
-
Micropile Performance Variability: A Fundamental Case StudyBy Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002
-
Overview Of Enabling Works For Waterfront Structures – Design & ConstructionBy Nagarajan. D, Raja Rajan. K, Vijayakumar. T
Major bridges crossing mighty rivers must be constructed in flowing water. Constructing the sub-structure in water has been a challenging job for contractor. Special construction techniques with marin
Nov 1, 2022
-
Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)By Dennis Nottingham
"Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per
Jan 1, 2005
-
Studies On The Use Of Dcis Piles For Mitigating Liquefaction Of SoilsBy Viswanadham B. V. S., Babu K. V
Many refineries are in the process of revamping and expanding their existing facilities. Most of the refineries are located in coastal areas due to ease of transportation and storage of crude oil. Con
Sep 1, 2022
-
Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West AfricaBy Maurizio Siepi, Bruno Vingiani, Claudio Asioli
"The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill
Jan 1, 2016
-
Specialty Geo-Engineering in a Caisson TownBy William H. Walton, Joel Dellaria, Jeffrey R. Hill
The City of Chicago has a world-renowned skyline and is known for its provocative architecture. The subsurface conditions in the city have allowed for construction of these significant structures. The
Jan 1, 2019
-
Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage Des Quinze Dam (Quebec, Canada)By Danny Déry-Chamberland, Peter Bowman, Michael Byle
"The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on
Jan 1, 2016
-
Piles In Expansive Soil For Large Tension Forces ? SynopsisBy G. W. Plant
This paper describes the design philosophy and construction details of piles between 25m and 32m deep to support 160m high and 110m base diameter cooling rowers for a major power station. It is sited
Jan 1, 2010
-
Failure Analysis and Strengthening of Tailing Pond Embankment by Prefabricated Vertical Drains and GeogridBy Anup Kumar Mandal, Sanjoy Chowdhury, Biswajit Das
"Tailing pond of an iron ore mine necessitated raising the height of its embankment to create additional storage capacity. The tailing pond is located in eastern India and raising the height of embank
Jan 1, 2015