Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Multiseam Mining On South African Collieries

    By R. W. Hill

    Multiseam mining has been carried out at many collieries in South Africa. It the seams are In close proximity difficult and dangerous mining conditions may arise. In the Witbank area multiseam bord an

    Jan 1, 1995

  • SME-ICGCM
    Assessment Of Underground Structural Design

    By Eugene D. Krupa

    Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is

    Jan 1, 1990

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    Investigation of Electromagnetic Emissions in a Deep Underground Mine (0366ea57-3ba7-4a00-bec7-825a048e7e26)

    By Douglas Scott

    Highly stressed rock in stopes continues to be a primary safety risk for miners in underground mines because it can result in failures of ground that lead to both injuries and death. Spokane Research

    Jan 1, 2004

  • SME-ICGCM
    Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design Features

    By Thomas M. Barczak

    The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas

    Jan 1, 2001

  • SME-ICGCM
    Rock Reinforcement Longevity

    By Francis S. Kendorski

    Rock reinforcement has been in widespread use and generally has been accepted in underground mining and tunneling since the 1950s. The first rock reinforcement technologies employed were mechanical an

    Jan 1, 2000

  • SME-ICGCM
    A Novel and Effective Method to Develop Tension in a Roof Bolt

    By Phillip E. Gramlich

    Through extensive practical experience and multiple studies, tensioned roof control systems have proven beneficial in difficult mining conditions. Due to increased mining of less desirable seams, ten

    Jan 1, 2014

  • SME-ICGCM
    Numerical Model Simulation of a Development Pillar at a Steeply Dipping Underground Limestone Mine

    By Morgan M. Sears, Gamal Rashed, Jim Winfield, Brent Slaker

    "Over the past decade, ground falls have resulted in five fatalities, representing over 40% of all fatalities occurring in underground stone mines in the United States. In conjunction with recent high

    Jan 1, 2018

  • SME-ICGCM
    The Impact Factors of Overburden Movement in Longwall Mining of Shallow Coal Seams

    By Yang Li

    For the study of overburden movement in longwall mining of shallow coal seams, most scholars merely consider the thickness of bedrock and top soils. In this paper, the overburden movement in longwall

    Jan 1, 2014

  • SME-ICGCM
    Ground Control Experiences in a High Horizontal Stress Field at Inland Steel Coal Mine NO. 2,

    By C. Thomas Blevins

    This paper is intended to be a hands on experience account about ground control in a Southern Illinois coal mine. Its aim is to show how a combination of real world mining practices and constraints al

    Jan 1, 1984

  • SME-ICGCM
    Mitigation of a Massive Sandstone Channel's Impact on a 1,500 Ft Wide Longwall Face

    By Daniel W. Su

    This paper presents the implementation and evaluation of the hydraulic fracturing technique and Longwall Visual Analysis (LVA) software to mitigate the impact of a 1,000-ft (305-meter) widemassive san

    Jan 1, 2012

  • SME-ICGCM
    Stress Control Method Applied to Stabilization of Underground Coal Mine Openings (e5cbe8ad-30a8-4144-a7b5-db19e81a247a)

    By Shosei Serata

    Serious floor heave of up to 2.4 m in a 2.4-m high mine entry was eliminated by applying the stress control method of mining, as a last resort, at the No. 5 coal mine of Jim Walter Resources, Inc., in

    Jan 1, 1984

  • SME-ICGCM
    Bailey Mine Slurry Impoundment Longwall Subsidence Monitoring

    By Richard J. Perin

    Subsidence monitoring was conducted in proximity to the 1-A and 2-A longwall panels at Consol Pennsylvania Coal Co.'s (CPCC) Bailey Mine slurry impoundment. Monitoring fullfills federal Mine Safe

    Jan 1, 1988

  • SME-ICGCM
    Failure Modes Of Mine Tunnels In Stratified Rock Structures With Reference To Stress Field Conditions

    By Hui Chen

    The paper describes the use of a physical model technique to investigate the failure modes of mine tunnels with reference to the in situ stress field. The characteristics of stratification commonly en

    Jan 1, 1993

  • SME-ICGCM
    Causes of Massive Directional Roof Falls in Room and Pillar Mines - Two Case Studies

    By S. S. Peng

    In recent years many roof falls have been conveniently attributed to the adverse existence of a high horizontal stress. The normal practice of not conducting a follow-up study in a roof fall investiga

    Jan 1, 1999

  • SME-ICGCM
    Geo-Mechanical Property And Failures Of Weak Roof Shales In Coal Mines

    By Yunqing Zhang

    Weak shales refer to those with lower strength, thinly- laminated structure, sensitivity to moisture and weathering as well as significant time dependent behavior. It has been said that many future co

    Jan 1, 2004

  • SME-ICGCM
    Hydrogeologic Effects Of Subsidence At A Longwall Mine In The Pittsburgh Coal Seam

    By Leslie Carver

    The effects of longwall mine subsidence on water resources were studied at a West Virginia coal mine (mine Z) by Carver (1994). Data were obtained for 137 domestic supply wells and springs and 12 base

    Jan 1, 1994

  • SME-ICGCM
    Investigations Of Underground Coal Mine Bursts

    By K. Haramy

    Coal mine bursts or bumps involve the violent, rapid failure of coal and rock in or around a mine excavation. Failure is normally associated with high stress and brittle or brittle-elastic materials;

    Jan 1, 1984

  • SME-ICGCM
    Optimization Of District-Wide Mine Layout In Multi-Seam Mining: A Case Study

    By Huamin Li

    Mine # 8 of Pindingshan Coal Group, Henan Province, China has an annual production 2 million metric tons. But it encounters many problems, e.g. mine layout is complicated, roadway maintenance is diffi

    Jan 1, 2000

  • SME-ICGCM
    Coal Mine Seismicity And Bumps: Historical Case Studies And Current Field Activity

    By John L. Ellenberger

    The National Institute for Occupational Safety and Health (NIOSH) has continued the research role of the former U.S. Bureau of Mines to develop techniques that will reduce the hazards in the mining wo

    Jan 1, 2000