Execution Example of the Expanded Dry Jet Mixing (EX-DJM) MethodBy Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Experimental Investigation on Drag Load Acting on Single End-bearing Piles in Collapsible Soil due to InundationBy Adel M. Hanna, Ibrahim M. Mashhour
"Collapsible soil is known as one of the difficult soils, which possesses considerable strength when it is dry and significantly reduced when inundated. In practice, in case of a thick layer, pile fou
Jan 1, 2015
-
Suwanee American Cement Plant, Branford, Florida: A Case Study Of Large Diameter Continuous Flight Auger Design Build FoundationsBy Gordon King
This paper presents a case study of large diameter continuous flight auger (CFA) piles and drilled shafts utilized for foundation support of a series of heavily loaded cement plant structures at the S
Jan 1, 2003
-
The First Cut-Off Wall In The Indian Himalayas For The Dam Of The Dhauliganga Hydroelectric ProjectBy Wolfgang G. Brunner
In the far north of Uttar Pradesh Province in the Indian Himalayas, the 280 MW Dhauliganga hydroelectric power plant is under construction by National Hydroelectric Power Corporation (NHPC), a state-
Jan 1, 2004
-
Model Specification Helical Anchor Foundations Tension Applications"This model specification includes sample text shown in normal font with commentary in italics. The commentary is intended to highlight project-specific items the specification writer should consider
Jan 1, 2016
-
Session 12 "Deep Mixing Method II"By Helen Ahnberg
The scope of the present paper is limited to report the experimental evidence and not for describing the analytical assumptions. However, the idea behind the experimental program is that the deteriora
Feb 10, 2003
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
A Field Study to Analyze Pile Setup Behavior and Comparison of Pile Capacity Methods from CPTBy Md. Nafiul Haque, Murad Y. Abu-Farsakh, Chris Nickel
"This paper presents the results from a pile load testing program for a bridge construction project in Louisiana. The testing includes two 54-inch open-ended spun cast concrete cylinder piles (OECP),
Jan 1, 2017
-
Lateral Load Testing Of Pile FoundationsBy Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
A Numerical Study On The Lateral Resistance Of Steel-Concrete Composite Drilled Shafts For Long-Span BridgesBy Juhyung Lee
Recently, large diameter drilled shafts are often used for foundations of large-scale marine bridges with high capacity and required to resist lateral loads. Steel casings are essential in supporting
Jan 1, 2008
-
A Coupled FE-BE Formulation For The Prediction Of Vibrations Due To Vibratory And Impact Pile DrivingBy H. R. Masoumi
This paper presents a numerical model for the prediction of free field vibrations due to vibratory and impact driving. As the focus is on the response in the far field, where deformations are relative
Jan 1, 2006
-
Suction Bucket InstallationBy Avi Shonberg
With the advancement of offshore wind farm projects towards deeper waters and larger wind turbine generators, founda- tion solutions other than the monopile have received increasing attention over the
Jul 1, 2022
-
Slope Stabilization of Mill Creek Landslide Using Steel H-PilesBy Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis
"Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2
Jan 1, 2015
-
Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"By R. Paul De Bruyn
A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.
Jan 1, 1990
-
The Construction And Performance Of Post-Grouted Micro-Piles For Vancouver International Airport Domestic Terminal Building - IntroductionBy Ernest Naesgaard
Post-grouted micro-piles were used for the seismic upgrading of the Vancouver International Airport Domestic Terminal Building (DTB). The micro-piles provided vertical resistance to both uplift and c
Jan 1, 2004
-
Microstructure of Bio-Cemented Coarse SandBy Abdelmalek Bouazza, Aamir Mahawish, Will P. Gates
Bio-grouting by means of microbial induced calcite (calcium carbonate) precipitation (MICP) to improve mechanical properties of granular soils has gained much attention in recent years. The biogroutin
Jan 1, 1900
-
The Little Lake Harris Bridge Settlement Restoration Project: Lessons LearnedBy Amr Sallam, David Thompson, Moataz Hassan
"The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State
Jan 1, 2015
-
Innovative Methods Of Dealing With Contaminated Soils In Drilled Shafts - SynopsisBy William F. Loftus
When high capacity diameter pipe piles are driven open-ended into the underlying bedrock, the material gathered inside the pipe often must be excavated to allow concrete to be placed within, in a clea
Jan 1, 1996
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
"The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica