  • DFI
    Caltrans Bridge Seismic Design/Retrofit Criteria ? Synopsis

    By Brian Maroney

    In this paper an overview of the California Department of Transportation's (CALTRANS) bridge design criteria is presented. Special emphasis is focused upon seismic design and retrofit criteria. T

    Jan 1, 1993

  • CIM
    Leaching/flotation processing of complex sulphide ores

    By Franciszek Letowski

    "Recovery of precious metals associated with a sulphidic matrix has an important economic effect on complex sulphide ore treatment. Because a significant portion of the silver and gold associated with

    Jan 1, 1987

  • SME
    Comparison Of Arched And Flat Seal Designs Using Finite Element Analysis

    The failure of a seal in an underground coal mine can have devastating consequences. Traditionally seals have been constructed as flat walls. Large hydraulic dams, on the other hand, are constructed

    Jan 1, 2007

  • SME
    Techniques for Assessing and Mitigating Longwall Subsidence Effects on Highway Bridges Mining, Metallurgy and Exploration (81ecdff2-8ca5-451f-abf7-490db849ce9c)

    By Yi Luo, Jian Yang, Hua Jiang

    Surface subsidence events induced by underground longwall coal mining operations can cause various disturbances to surface structures ranging from integrity and stability to functionality problems. Hi

  • NIOSH
    OFR-122(5)-78 Advancing Oil Shale Mining Technology: Program Evaluation - Economic Mine Models

    By G. F. Kuncir

    This volume was prepared in support of an evaluation of the Advancing Oil Shale Mining Technology Program performed by The Aerospace Corporation under a Bureau of Mines contract. The evaluation is des

    Jan 1, 1977

  • DFI
    Dynamic Monitoring Program Results Indicator Pile Tests -I-880 - Introduction

    By D. Michael Holloway

    The realignment of Interstate 880 replaces the double-decked (Cypress) viaduct collapsed in Oakland, California during the 1989 Loma Prieta Earthquake. The California Department of Transportation (CAL

    Jan 1, 1996

  • NIOSH
    IC 8175 The Application Of Hydraulic Fracturing In The Recovery Of Oil By Waterflooding: A Summary (70dc5043-3530-4999-9ad0-996ab55129a4)

    By James A. Wasson

    This report summarizes the results and conclusions reached by various investigators who have attempted to determine the extent to which hydraulic fracturing will affect the secondary recovery of crude

    Jan 1, 1963

  • NIOSH
    OFR-185-82 Biological Oxidation Of Iron (II) By T. Ferrooxidans In A Sequencing Batch Reactor

    By Thomas L. Theis

    The use of a suspended growth system of T. ferrooxidans attached in a film to individual particles of bentonite and operated as a sequencing batch reactor has been shown to be a practical way of oxidi

    Jan 1, 1982

  • AUSIMM
    A Laboratory Study of The Induced Polarization Response of Some New South Wales Sulphide Ores

    Laboratory induced polarization measurements were made on representative samples of concentrated sulphide ores from three environments in New South Wales Comparisons were made with the membrane polari

    Jan 1, 1969

  • AUSIMM
    Ore Mineralogy of the Favona Epithermal Deposit, Hauraki Goldfield, New Zealand

    I report results of over 850 microprobe analyses of sulfides, sulfosalts and electrum from the Favona adularia-sericite epithermal deposit of the Waihi district in the southern Hauraki Goldfield of Ne

    Jan 1, 2004

  • SME
    Risk Ranking In Tunneling Projects With Fuzzy Electre Method

    By A. Yazadni-Chamzini

    Risk ranking of projects is one of the importance parts of the complicated risk management procedure. Recognizing the riskiest criteria enable the managers to plan for risk reduction. The first stage

    Jan 1, 2012

  • AUSIMM
    Tubular Steel Headframe for Winze Sinking at North Broken Hill Ltd., Broken Hill

    Winzes are usually sunk 9 ft. 6 in. long by 6 ft. 0 in. wide and are divided into two compartments, 4 ft. 0 in. by 5 ft. 0 in. inside the timbers. The general practice is to sink the winze to a depth

    Jan 1, 1941

  • CIM
    Horses for Courses – Tailoring Front End Design to Project Requirements

    By Paul Staples, Paul Messenger, Greg Lane

    "Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic

    Jan 1, 2008

  • DFI
    Site Management Towards Pile Execution At Qurashiya Bridge

    By Emad W. Shublaq

    Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur

    Jan 1, 1992

  • NIOSH
    RI 3468 Chemical Considerations Relating To Fires In Anthracite Refuse ? Introduction

    By G. W. Jones

    Fires in anthracite refuse banks are troublesome and may become exceedingly costly to combat. Instances are known in which refuse-bank fires have grown to such magnitude that entire mining properties

    Jan 1, 1939

  • DFI
    EFFC-DFI Geotechnical Carbon Calculator Project

    By Vincent Joannes, Marine Lasne, Luca Brenelli, Colin Serridge, Inge van Baardwijk, Martin Stanley, Anthony Fisher, Mary Ellen Bruce, Tony Suckling, Pedro Avellanosa

    "Abstract The European Federation of Foundation Contractors (EFFC) and Deep Foundations Institute (DFI) developed a sector-specific carbon accounting methodology and associated “carbon calculator” for

    Jan 1, 2014

  • AUSIMM
    Coal Research in New Zealand - Exploration to Utilisation: Making Applied Links in the Energy and Coal Industries

    By A H. Clemens, T A. Moore

    This paper discusses a number of technical issues related to marketing coal. It outlines how the results of research undertaken in New Zealand and overseas can help producers address a range of techni

    Jan 1, 1997

  • NIOSH
    OFR-68(3)-81 An Annotated Bibliography Of Metal And Nonmetal Mine Fire Reports - Appendix - Introduction

    This appendix is composed of five sections, each of which is tabbed for ease of access. The sections are as follows: ? Fire incident report forms for underground mine fires. There is one form for eac

    Jan 1, 1980

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • AIME
    Reservoir Engineering – General - The Interpretation of Interference Tests in Naturally Fractured Reservoirs with Uniform Fracture Distribution

    By H. Kazemi, G. W. Thomas, M. S. Seth

    The double-porosity model of Warren and Root7 for examining pressure drawdown and buildup phenomena in naturally fractured reservoirs has been extended to intetpret interference test results. Both ana

    Jan 1, 1970