Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Changing Powder Distribution in the Highwall Holes Reduces Overbreak and Rockfall Hazards

    By Virgil J. Stachura, Calvin L. Cumerlato

    The Bureau of Mines conducted a series of tests to develop a blasting method that would reduce overbreak and rockfall hazards at a limestone quarry in northeastern Wisconsin. Reductions in overbreak w

    Jan 1, 1989

  • ISEE
    Surface Vibration Measurements from Deep Hole Blasts

    By Jesus Pascual, Jose Sanchidrian, Pablo Segarra

    The surface vibration field in the area above an underground mine prior to its development has been investigated, in order to assess the vibration levels expected in existing buildings and in the plan

    Jan 1, 2002

  • ISEE
    Gradation Control Using Low Density Bulk Emulsion

    By Adam T. Young

    This paper will describe the process of using low density bulk emulsion as a means to maximize the production of an oversize or “rip rap” aggregate size range (8 inch to 72 inch) that the quarry custo

    Jan 1, 2017

  • ISEE
    Control of Blast Overpressure and Vibrations at the Underground Research Laboratory

    By D P. Onag, B Mohanty

    AECL Research (AECL) has constructed an Underground Research Laboratory (URL) as a facility for research and development in the Canadian Nuclear Fuel Waste Management Program. The objectives of the pr

    Jan 1, 1991

  • ISEE
    Reactivity of ANFO Mixtures with Midwest High Sulfur Coals and Pyrites

    By John W. Brown

    For seventeen years, I have been involved in surface coal mining in the Mldwest coal fields only to find that once again, I have experienced a problem that was not known to exist in our area. The exis

    Jan 1, 1992

  • ISEE
    Open Pit Blasting in India

    By D D. Garg, D A. Wasson

    Open pit blasting in India uses two types of explosives. First there are bulk explosives for wet and dry holes, and there are packaged explosives. The Indian open pit coal mining is projected to use 1

    Jan 1, 1995

  • ISEE
    Drilling and Cost Analysis Usign a Personal Computer and Spreadsheet

    By William D. Hissem

    The purpose of this paper is to advise people about the methods, use, and possible applications of current "personal computer" hardware and software with regard to the economic cost analysis of percus

    Jan 1, 1986

  • ISEE
    The Science and Testing Behind Quantitative Risk Assessment Models

    By Michael Swisdak, John Tatom

    In a quantitative risk assessment (QRA), the ability to accurately model real-world situations is obviously critical. In the end, the model must be able to represent the effects produced by the detona

    Jan 1, 2007

  • ISEE
    Status of International Standards on Blasting

    By Gerald R. Coonan

    I'm really here to talk about my pet subject of government relations. I've been in Peabody's Environmental Quality Department, working on regulations, for over five years, and I have seen a number of

    Jan 1, 1980

  • ISEE
    Controlled Study of the Effects of Temperature and Humidity vs Blast Vibrations on Homes

    By R Wing, D Corkery

    "Several mines in the region of Sudbury, Ontario, occur in or near populated areas. In anattempt to examine the effects of environmental changes and blast induced vibrations onhomes in the area, a mon

    Jan 1, 1993

  • ISEE
    Dugout Blasting for Livestock Water

    By Mike Cammack

    Western South Dakota is predominately an agricultural area, with exception of the mining and timber industries in the Black Hills region. With precipitation rates averaging below fifteen inches per ye

    Jan 1, 1993

  • ISEE
    Supression of Blast Pressure and Noise from Implosive Type Connectors

    By Ettore Contestabile, Cameron Thomas

    Implosive-type electrical/mechanical connectors such as XECONEX have been used extensively for joining electrical transmission lines. This implosive action of explosives has also been applied to other

    Jan 1, 1995

  • ISEE
    Wall Control Blasting at the Manassas Quarry

    By J Lyall Workman, Peter N. Calder

    The Manassas Quarry is a large industrial stone quarry in Northern Virginia owned and operated by Vulcan Materials Company. The quarry experienced instability in a portion of the north wall, which inc

    Jan 1, 1992

  • ISEE
    Supression of Blast Pressure and Noise from Implosive Type Connectors (b7d7fd43-f48c-43a3-af6c-8966c9e70d51)

    By Ettore Contestabile, Cameron Thomas

    Implosive-type electrical/mechanical connectors such as XECONEX have been used extensively for joining electrical transmission lines. This implosive action of explosives has also been applied to other

    Jan 1, 1995

  • ISEE
    Ground Preparation Planning for Surface Mine Excavating Practice

    By Malcolm Scoble

    The estimation of digging, ripping and blasting requirements in advance of mine production is a difficult task. The characteristics of the superficials and rock mass govern the type and intensity of g

    Jan 1, 1985

  • ISEE
    Applications of the Hand Held Programmable Calculator in Field Problem Solving

    By J R. "Dick" Daniel

    Over the past several years, the Hercules Technical Service Group for the Explosives Department has produced a series of programs for the TI59 programmable calculator dealing with explosive applicatio

    Jan 1, 1984

  • ISEE
    Merging an Open Pit with an Underground Mine

    By Charles L. Greening

    MARTIN MARIETTA CEMENT at Martinsburg, West Virginia, has been and presently is engaged in coupling present open pit with old underground workings. Various drilling and blasting techniques have been i

    Jan 1, 1982

  • ISEE
    Hard Rock Blasting in an Underground Coal Mine

    By Mark D. Kirkbride

    This paper outlines the process for designing a hard rock blast in an underground coal mine. The coal mine is located in Western Kentucky and operates four continuous miner units at 7 unit-shifts per

    Jan 1, 1999

  • ISEE
    Rugged Emulsion Explosive Formulation #37 - Candidate Permissible

    By Michael S. Wieland, Thomas C. Ruhe

    Delay blasting in underground coal results in shock waves traveling through the coal that can damage delay charges remaining in the blast pattern. Undetonated explosives which are dynamically desensit

    Jan 1, 1992

  • ISEE
    In-situ Fracture Stimulation: A State of the Art Review

    By Mario Karfakis, G. Langlois

    Well stimulation is the process by which any production well, whether for production (extraction), storage (injection) or deep interaction (remediation, monitoring, etc) can be made or stimulated to f

    Jan 1, 2009