Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Augered Cast-in-Place Pile Manual, Second Edition, 2003

    The development of Augered Cast-In-Place (ACIP) piles started in the late 1940's when several projects were performed by Intrusion-Prepakt, Inc. utilizing various techniques to place the piling.

    Jan 1, 2003

  • DFI
    Safety And Economics Of Working Platforms – A Uk Perspective

    By David Corke

    The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra

    May 1, 2022

  • DFI
    Driven Pipe Pile Solutions for the Temporary Foundations at the New San Francisco-Oakland Bay Bridge

    By Manuel M. Reyes, Thuraisamy Thavaraj, Alex Sy

    "The new east span of the San Francisco-Oakland Bridge features a single tower self-anchored suspension (SAS) bridge. During construction of the SAS bridge, a temporary bridge was used to support the

    Jan 1, 2015

  • DFI
    Deep Mixing Technology: Comparison between Laboratory and Field Test Result, Different Jobsite Application.

    By Alessandro Bertero, Stefano Valagussa, Filippo Maria, Wesley Schmutzler, Leoni

    "Abstract The Deep Mixing Method (DMM) represents a viable solution to improve the adverse geotechnical properties of foundation soils. Differences and the importance of performing pre-construction la

    Jan 1, 2014

  • DFI
    Innovative Deep Foundation Support Using Ductile Iron Piles

    By Thomas Billups, Brendan FitzPatrick, Doug LeDo, David Carchedi

    "Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical analysis and design. These challenges often include working on site

    Jan 1, 2016

  • DFI
    Willow Island Hydroelectric Project: Taming the Ohio River to Create Green Energy

    By James M. Tantalla, Jr. Ellman

    "Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff

    Jan 1, 2016

  • DFI
    Deep Dry Soil Mixing Performance and Quality Control Acceptance Criteria

    By Patrick K. Wong, Richard Kelly

    "The variability in strength and compressibility of in situ deep soil mixing products can be greater than the variability of the natural soil. However, satisfactory performance can be achieved by care

    Jan 1, 2015

  • DFI
    Evaluating Lateral Bracing Code Requirements for Large Diameter Foundations

    By Jon Huff, Jeffrey Donville, Hannah Iezzoni, Dan Stevenson

    Occasionally, in the design of deep foundations for a structure, a single deep foundation element may be used to support a building column. The most common type of element used in such cases is a dril

    Sep 8, 2021

  • DFI
    Piled Foundations for the New Wembley Stadium, London

    By Anthony L. Reynolds, Clifford J. Wren

    "The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable

    Jan 1, 2005

  • DFI
    Three Deep Mixing Projects: Comparison between Laboratory and Field Test Results

    By George Filz, Morales, Carlos, Bertero, Filippo Maria, Alessandro, Leoni

    "The Deep Mixing Method (DMM) represents a viable solution to improve adverse geotechnical properties of foundation soils for many practical applications. A pre-construction soil investigation campaig

    Jan 1, 2015

  • DFI
    Inspection and Observation Methods

    "Full time inspection of drilled shafts by qualified personnel is a necessary part of construction. Detailed inspection procedures for routine inspection are provided in the Drilled Shaft Inspector’s

    Jan 1, 2004

  • DFI
    Ground Improvement Using Stone Columns To Mitigate Liquefaction Potential Of Fine Sand By Wet Top Feed Vibro Replacement Method – A Case Study

    By Parameswaran V. S, Anshuman Singh

    This is a case study on ground improvement using Stone columns at Kokrajhar in Assam which comes under seismic Zone V as per IS: 1893. The strata at site comprised of mostly fine sands with low SPTN v

    Nov 1, 2022

  • DFI
    Analysis of Structural Capacity and Stiffness of Drilled Shafts with Construction Defects and Repairs

    By John P. Turner, Benjamin J. Turner

    "Non-destructive testing and evaluation (NDT/NDE) methods have become standard tools as part of the post-construction quality assurance of drilled shaft foundations. In responding to anomalies, founda

    Jan 1, 2016

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Case History: Large Diameter Micropiles for the Highway 53 Relocation Project

    By Nathan W. Iverson, David S. Graham, Paul J. Axtell

    "The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a

    Jan 1, 2017

  • DFI
    Development Of Design Charts For Sand Compaction Pile Method Of Improvement For Loose To Medium Dense Sands

    By N. Aarthi, G. R. Dodagoudar

    The improvement of soft clay deposits using stone columns is a well-established ground improvement technique in the western world. This technique has been well documented and has proper design codes f

    Nov 1, 2022

  • DFI
    Design Issues for Mini-Caissons in the NYC Area

    By Caciola Jr. Joseph J., Nidal M. AbiSaab

    "Thanks in great part to the geology of the New York City Metropolitan area, mini-caissons are a popular choice for deep foundations. These drilled elements are readily available, easy to install with

    Jan 1, 2016

  • DFI
    Installation Effects of Drilled Screw Pile In Soft Clay

    By Jianhua Wang, Jianming Yao, Zhen Meng, Jinjian Chen

    "Drilled screw pile is a newly developed displacement pile foundation which has been applied in soft clay for many years. Compared with traditional circular displacement pile, It is characterized by h

    Jan 1, 2015

  • DFI
    Securing of In-Situ Cement Mixing Quality for the Expansive Soil with the ‘Montmorillonite’ Inclusion

    By Masaru Sakakibara, Ngo Tuan Anh, Mitsuo Nozu

    "In the southern region of Vietnam and the southern United States, numbers of Deep Mixing (DM) columns have been installed to increase the stability of slopes and mitigate ground settlement. However,

    Jan 1, 2015

  • DFI
    Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures

    By Vijaya Bhushan Rao, Jason Redgers

    A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis

    Sep 8, 2021