Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Market Driven Performance Improvements at Brunswick

    By L. Flett, S. Woods, C. Deredin

    "Following a significant reduction in world Imperial Smelting Furnace (ISF) capacity from 2003 to 2008, a major optimization initiative was successfully carried out on the lead upgrading and bulk (zin

    Jan 1, 2013

  • CIM
    German Experience in Hydraulic Coal Mining and its Application to Canadian Conditions

    By H. Harzer

    Statistics Canada record s indicate that in recent years 70 to 80% of the entire Canadian coal production originated from Western Canadian mines, in which about 55 to 65% of the coals are bituminous.

    Jan 1, 1978

  • CIM
    Effect of Oil Sand Mining Operations on Haul Truck Dump Body Design

    By David Whalen

    Mobile equipment in oil sand mining operations experience more maintenance problems than similar equipment in other surface mines, due to soft underfoot conditions. Oil sand properties are known to va

    May 1, 2003

  • CIM
    The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground Voids

    Safe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such

    May 1, 2007

  • CIM
    Lessons Learned from Measuring and Monitoring the Social License to Operate

    By Ian Thomson

    The Social License to Operate ? We are operating in an era where social license in the resource industry is as important ? if not more important ? than mineral potential ? Concept proposed by Plac

    Aug 1, 2013

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • CIM
    Enhanced Gravity Recovery of Base Metal and Industrial Minerals

    "Mineral separation by exploiting the differences in mineral or metal specific gravities (sg) has been used since antiquity. In the modern era, this is most commonly seen in the recovery of gold by t

    Jan 1, 2017

  • CIM
    Effect of Environmental Conditions and Rock Properties on Adhesive Bond of Thin Spray-on Liners

    By Hasan Ozturk

    Laboratory testing examined the effect of a variety of intrinsic rock properties and environment conditions that influence the adhesive bond between rock and thin spray-on liners. The liner materials

    May 1, 2004

  • CIM
    Concentrator upgrade program at the Iron Ore Company of Canada, Carol Lake Concentrator: concentrator upgrade testing program; concentrator flowsheet development

    By Martin Nevens

    "In 1998, the Iron Ore Company of Canada initiated an aggressive program to improve the performance of its Carol Lake Concentrator located in Labrador City, Newfoundland. This program was termed the C

    Jan 1, 2002

  • CIM
    Toward the 24 hour large SAG Mill Reline

    By John Russell

    "Faster, safer, grinding mill relining offers the obvious attractions of reduced mill relining times with the knock-on incentive to reduce all other maintenance down-time, opening the possibility for

    Jan 1, 2008

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • CIM
    Monitoring of Highwall Stability at the Dome Open Pit

    By John G. Henning

    The Porcupine Joint Venture operates the Dome Mine in South Porcupine, Ontario. Dome underground began production in 1910. It is the longest continuous operating gold mine in Canada, producing in exce

    May 1, 2004

  • CIM
    Geology and Oxide Mineralization of the Pipestone Lake Anorthosite Complex, Manitoba

    By D. C. Peck, H. D. M. Cameron, N. M. Halden, L. S. Jobin-Bevans

    Abstract-The late Archean Pipestone Lake anorthosite complex (PLAC) is a 0.9 x 17 km sill-like layered intrusion that is part of a suite of coeval megacrystic anorthosite bodies in the Cross Lake regi

    Jan 1, 1997

  • CIM
    FLAC Simulation of Split-Pipe Tests on an Instrumented Cable Bolt

    By Marc Ruest

    A new instrumented cable bolt has been developed by the National Institute for Occupational Safety and Health at the Spokane Research Laboratory in Spokane, WA. Although various instruments are availa

    May 1, 2002

  • CIM
    Geometallurgical Modeling of the Dumont Deposit (0daa1b2e-54ab-4163-adcf-32c9366ffe5b)

    By K. Nasrallah

    "The Dumont deposit is a large (1,179 Mt proven and probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporatio

    Jan 1, 2016

  • CIM
    Hardness Model and Reconciliation of Throughput Models to Plant Results at MINERA Escondida LTDA., Chile.

    By Leonardo Flores

    "Minera Escondida operates two open pits on a porphyry copper district, southeast of Antofagasta, Chile. During 2005, ore will be delivered exclusively from one pit to two concentrators, while from 20

    Jan 1, 2005

  • CIM
    Managing Pit Slope Displacements: Highland Valley Copper?s Lornex Pit Southwest Wall

    By H. Warren Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    May 1, 2002

  • CIM
    Using Laboratory Scale Flotation Testing to Predict Pilot Scale Flotation Performance

    By E. Amini

    "While methods exist to allow the simulation and optimization of existing flotation operations, there is a deficit in the ability to predict the performance of a new ore type pre-processing. A laborat

    Jan 1, 2009

  • CIM
    Predictive Control and Real Time Optimization in the Minerals Industry

    By Quin Dennis

    Process Optimization ?What is it really? It is NOT ?a larger fan to increase draft through a process ?a larger pump on a wet circuit ?a wider conveyor belt for solid materials ?a larger feed el

    Nov 1, 2011

  • CIM
    Terraflow: A Cost-effective Alternative Binderin Backfill Application

    By Ike Isagon

    Outline 1.Background Sudbury Backfill Operations 2.Alternative Binder 3.Alternative Binder Trial Process Flow Diagram ?Laboratory Results ?Plant Trial ?Final Evaluation and Approval ?Manageme

    Nov 1, 2011