Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 10
- File Size:
- 2155 KB
- Publication Date:
- Jan 1, 2017
Abstract
"The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled with gold-bearing sulphides and quartz. The mineralised zones are up to 1 m in width, have average grades of 4 to 5 g/t, and mostly dip between 10º and 60º to the north.Mazowe Mine is one of the oldest mines in Zimbabwe, and exploration and development in this region dates back to 1890, with over 1.4 million ounces of gold produced to date. Mazowe mine comprises two underground operations, Mazowe and the BSV sections. Ore is processed in a single plant which consists of conventional crushing and milling and carbon-in-leach facility.Baldmin Projects was awarded the contract for the design, construction and commissioning of the 60,000 tonnes per month plant at Mazowe mine in 2014 for the processing of sand and slimes tailings from previous operations at Mazowe mine. The average grade of the tailings is 1.1 g/t. The plant consists of feed preparation, grinding, flotation, thickening of flotation concentrate, and carbon in leach (CIL). A pump station for hydraulic mining of the slimes tailings dam also part of the plant.Key features of the Mazowe sands Plant are described and include:• Hydraulic mining of gold tailings dump.• Feed preparation section that includes a (W x L) 2.4 m wide x 4.8 m trash screen, 250 m3 surge tank, a cluster cyclones with 2 x 500 mm diam. Cyclone.• Comminution circuit designed for a bond work index range of 10-12 kwh/tonne. comminution circuit is constituted with 3 ball mills, 1.83 m diam. X 6.71 m Long, 280 kW.• Flotation circuit comprising rougher bank, scavenger bank and cleaner bank. Rougher Scavenger bank is constituted of 6 x 6m3 flotation cells and 3 x 30 m3 flotation cells and the cleaner is constituted of 3 x 6 m3 flotation cells.• Concentrate Thickening with 6 m diam. Thickener.• Concentrate CIL (carbon in leaching): CIL circuit is comprised of 7 tanks with 2 leach tanks and 5 Carbon in leach."
Citation
APA:
(2017) Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, ZimbabweMLA: Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe. Canadian Institute of Mining, Metallurgy and Petroleum, 2017.