Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Carmen De Andacollo ? Start-Up of Teck?s New Copper Concentrator

    By C. S. R. Rondestvedt

    In February 2010, Teck?s newest Concentrator at Mina Carmen de Andacollo (CDA), Andacollo, Chile was commissioned. The Concentrator is a single line configuration, comprising of one 36 ft diameter x 2

    Jan 1, 2012

  • CIM
    Polymer Cable Carriers: A Reliable Cable Management & Protection Solution for the Mining Industry

    Carrying Energy ?Energy ?Power, data, signal, hydraulics, pneumatics? ?Needs to be conveyed from a stationary point to a system in motion ?Cable Carriers (steel and plastic), Festoon Systems,

    Nov 1, 2011

  • CIM
    Flotation Separation of Muscovite from Quartz Using Mixed Anionic/Cationic Collectors

    By Yue hua Hu, Wei Sun, Pan Chen, Li Wang, Runqing Liu, Central South University

    "The flotation separation of muscovite from quartz was investigated using mixed sodium oleate/dodecylamine (NaOL/DDA) collectors. The flotation experiments were conducted on single minerals and their

    Jan 1, 2016

  • CIM
    The Ausmelt Continuous Copper Converting (C3) Process

    By R. Matusewicz

    The key drivers for the copper smelting industry are a complex mix of economic and "human" factors which combine to drive technology in new directions and can provide a strong indication of future ind

    Jan 1, 2007

  • CIM
    Integrated Mining and Processing Systems Design for Eco-Efficiency

    By H. C. L. Reemeyer

    "The mining industry faces increasing economic, environmental and social challenges, as easier deposits deplete and ores become more difficult to mine and process; head grades decline; projects migrat

    Jan 1, 2017

  • CIM
    Nickel, Copper, and Total Precious Metal Recovery from Twin Metals Minnesota Concentrates Using the CESL Process

    By K. M. Mayhew, G. D. Barr, T. M. McCoy, C. T. Knilans

    "Teck Resources Limited (“Teck”) has developed and extensively tested on a continuous basis the CESL Technology hydrometallurgical process for treating copper and nickel sulphide concentrates, includi

    Jan 1, 2017

  • CIM
    Lower level operations in a thick steeply pitching seam at Cadomin Coal Mine; in Cadomin, Alberta

    By N. Melnyk

    "FOREWORDThis paper provides a unique description of a method devised for mining a very thick steeply dipping seam of soft gassy coal which was prone to spontaneous combustion. The editors con¬sider t

    Jan 1, 1985

  • CIM
    Sulphur Sources and Uses - Past, Present and Future

    By M. E. D. Raymont

    "During the history of the sulphur industry there have been three distinct phases of production. Factors controlling supplies during these periods have shifted from demand for sulphur to demand for en

    Jan 1, 1972

  • CIM
    The Sullivan Mine and Concentrator: A Review Of Three Years' Progress

    By M. M. O?Brien

    THE SULLIVAN MINE The Sullivan mine of the Consolidated Mining and ? Smelting Company of Canada, Limited, is situated at Kimberley, B.C., nineteen miles from Cranbrook, a divisional point on the Crows

    Jan 1, 1926

  • CIM
    Advanced Ni-Base Superalloys for Small Gas Turbines

    By K. Harris, J. B. Wahl

    Ni-base superalloy cast materials provide an outstanding balance of high temperature strength, fatigue resistance, oxidation resistance and coating performance and can be produced to very tight tolera

    Jan 1, 2010

  • CIM
    Metamorphic Mineralogy of the Dore Lake Complex in the Victinity of the Grenville Front

    By S. Kline

    The compositions of metamorphic minerals of the south limb of the Dore Lake Complex have been determined by microprobe techniques. Mineral assemblages typical of the greenschist facies occur in Mg-ric

    Jan 1, 1984

  • CIM
    Flocculation of froth flotation tailings from a coal washery

    By H. A. Hamza

    An experimental study of the settling characteristics of a washery effluent originating as tailings from a froth flotation circuit was undertaken by using a systematic approach to select the most appr

    Jan 1, 1979

  • CIM
    New Challenges Facing Cumerio Med Pirdop Plant

    By T. Beamish, I. Vasilev, T. Nikolov, E. Marinov, D. Kirilov, P. Barrios

    In April 2005, Umicore Copper de-merged from Umicore Group and created a new independent Copper company called Cumerio. As a separate company, Cumerio is a major European copper smelter and refinery a

    Jan 1, 2007

  • CIM
    Coal transportation

    By J. O. Pitts

    "Background The preponderance of Canada's coal resources is located in areas remote from high demand domestic users and at some significant distances from deepsea ports. This places great demands on t

    Jan 1, 1985

  • CIM
    Waters of the Red Coulee Area

    By W. P. Campbell

    In the course of the development of the Red Coulee field, northwest of Coutts, Alberta, a considerable amount of information has been gathered by the Department of the Interior regarding the chemical

    Jan 1, 1931

  • CIM
    Productivity Analysis of the Table Formwork Method for Making a Cost-Efficient Equipment Input Plan

    By J. B. Kwon

    For improvement in the productivity of tall building projects, table formwork is one of the main methods that have been adopted for slab formwork. Because the table formwork method is an equipment-ori

    Aug 1, 2013

  • CIM
    Understanding Electrical Energy Use at Copper Smelters

    By Lauri Pesonen

    "Although electrical energy use at copper smelters is typically about 15-20% of operational costs, it is something which is not very often analyzed and discussed at a detail level in technical papers

    Jan 1, 2017

  • CIM
    Managing Technology Risk

    By Chris Twigge-Molecey, John Peacey

    To meet the business objectives of a metallurgical project, there is often a need for new and untried technology or equipment, whose very novelty can present serious risks to meeting those objectives.

    Jan 1, 2015

  • CIM
    Risk Management in Carbon Sequestration: Case Studies from Unconventional Reservoirs in the Appalachian Basin

    Risk management has taken on renewed vigor since the economic crisis of the late 2000s. The resources of governments, individuals, and corporations are being stretched to a point where only the most p

    Aug 1, 2013

  • CIM
    New Opportunities for Closed Mining Sites: Bioprospecting for Antibacterial Agents

    By G. N. A. Senhorinho, J. A. Scott, C. A. Laamanen

    "Closed mine sites are widely regarded as a negative asset due to their legacy of environmental impacts. These sites are often characterized by waterbodies with elevated metal concentrations and low p

    Jan 1, 2019