Deep Soil Mixing Trials at Porto Alegre Airport, BrazilBy A. Ortigão, M. Felix, E. Falk, T. Koehler
"Ground improvement techniques such as vibro-replacement or deep soil mixing are fairly young products in the Brazilian geotechnical market. Soft soils in this country are deep, very soft, have low se
Jan 1, 2015
-
Deep Foundation Support for the Iconic New York WheelBy Satyajit Vaidya, Rudolph Frizzi, Quadri Owokoniran
"This paper presents a case history in the design and construction of high-capacity drilled shafts for the iconic New York Wheel presently being constructed along the St. George area waterfront in nor
Jan 1, 2016
-
Monopile Construction Technique For Mumbai Coastal Road Package 1 - MumbaiBy T Vijayakumar, Vipul Dobhada, Rajesh Patel, Swarnadip Dey, Naveen Babu D
The most challenging scope of any bridge project in marine or inter tidal zone is to construct sub structure like well Foundation, group pile, pile cap etc. Similarly, it also affects the marine envir
Sep 1, 2022
-
Virtual Imaging Technologies as Decision-Making Tools for Geo- HazardsBy Arpana P. Sabu, Themis Vaxevanis, Sissy Nikolaou, Guillermo Diaz-Fanas
Geo-failures from extreme events (landslides, wild fires, earthquakes, floods, etc.) have increased exponentially in recent years around the world and within the USA. When catastrophic failures occur,
Jan 1, 2019
-
Skin Friction In Shale: Results Of The Hwy. 81 Bridge, Yankton, SD Drilled Shaft Load TestBy Scott M. Mackiewicz
This project includes replacement of the historic vertical-lift span Meridian Bridge (U.S. Highway 81 over the Missouri River) that connects Yankton, South Dakota with rural Cedar County, Nebraska. T
Jan 1, 2008
-
The Cosmopolitan Resort & Casino, Las Vegas, NV Specialty Foundation Work Under Extreme ConditionsBy Lawrence Piccagli
This past spring of 2006, BENCOR installed the concrete reinforced diaphragm walls for the COSMOPOLITAN RESORT & CASINO in Las Vegas, Nevada. The project highlights include the excavation of approx. 3
Jan 1, 2007
-
Theoretical Simulation Approach For Load Settlement Characteristics Of Piles In Shale Deposits. - Synopsis :-By Subrata Ray
A large no of power stations are being set up in Chandrapur area having coal deposits. Several industries are also coning up in this area. The subsurface is geologically formed under Gondwana system a
Jan 1, 1996
-
Session 18 "Grouting for Micropiles & Anchors"By Jim Bruce
No answer required. From the drilling equipment suppliers, but the specifications must be tailored to be project-specific. Yes, the sonic technique is very interesting as we said, and it is not so muc
Feb 10, 2003
-
Lateral Load Testing Of Pile FoundationsBy Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Shoring of Long Beach Main Pump Station Utilizing Ground Improvement Methods, Long Beach, CABy Eric Lindquist, John Compagnone, Gabriel Carvajal
"Condon-Johnson & Associates, Inc. (CJA) with the assistance of design consultant, Brierley Associates, designed and installed a water tight shoring system utilizing several ground improvement techniq
Jan 1, 2017
-
Design of Grillage and Helical Pile Foundation for Limited Access Transmission LineBy Benjamin Jennings, Jason Herron
In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis
Jan 1, 2017
-
Innovative Foundation Support and Liquefaction Mitigation Using Deep Soil Mixing and MicropilesBy Leo Panian, Ryan Nagle, Priyanshu Singh, Gina Carlson, Wayne Magnusen
"This case study presents the design and construction of an integrated foundation and ground improvement solution utilizing deep soil mixing (DSM) and micropiles. 270 Brannan is a midrise office build
Jan 1, 2017
-
3D FEM Modelling of a Ground Improvement SolutionBy Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim
A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo
Sep 8, 2021
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
CPT Methods for Helical Pile DesignBy Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter
Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu
Sep 8, 2021
-
What It Takes (Geostructurally) To Extend The Plane Train Tunnel Under The World'S Busiest AirportBy Ryan T. Smith, Anthony Sahj, Alexander T. Darnell
Every second can count when trying to board a departing flight or catch a ride-share to your final destination. Hartsfield-Jackson Atlanta International Airport is in the midst of a project that aims
Oct 1, 2022
-
Liner Piles Used As Support To Kentledge For Initial Compression Load TestBy Venugopal B, M Kumaran, Thomas John, Vetriselvan A
The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t
Nov 1, 2022
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022
-
A Resilience Approach for Design of Earth Retaining Systems with Application on MSE WallsBy George Gazetas, Sissy Nikolaou, Fani Gelagoti, Irene Georgiou, Rallis Kourkoulis
"The need to shift geotechnical design from a “factor of safety” to a “performance based” design (PBD) approach has increased rapidly in the past years following examples from structural engineering.
Jan 1, 2016
-
Cutter Soil Mixing Solutions at the Leixões Cruise TerminalBy Xavier Pita, Alexandre Pinto, António Cristovão, Rui Tomásio
"The cutter soil mixing technology was been applied in Portugal since the last seven years. The aim of this paper is to present the main design and execution criteria, related with both the cofferdam