Instrumented Static Load Testing-Auger Cast-In-Place Piles - Introduction And PurposeBy Michael T. Lambert
The purpose of the this paper is to demonstrate the benefits of using additional instrumentation during load tests of auger-cast-in-place piles. Traditionally, only load and butt displacement are dete
Jan 1, 2000
-
"Static Load Testing" How Important Is It? ? IntroductionBy Jack Hayes
The design and construction of deep foundations involve many uncertainties. For the designer there are uncertainties regarding soil and ground water variability, regarding sampling and lab testing, re
Jan 1, 2000
-
Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - IntroductionBy Alan Alhadeff
Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi
Jan 1, 1990
-
New I-95 Woodrow Wilson Bridge FoundationsBy Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2009
-
Evaluation And Testing Of Distressed Pile Foundations Supporting Oil Storage TanksBy Michael W. Oakland
Weidlinger Associates was retained to evaluate the foundations supporting ten oil storage tanks at a tank farm on the east coast. The tanks were constructed over the site of a landfill which was unde
Jan 1, 2009
-
Dynamic Load Testing Of Augered Cast-In-Place PilesBy Garland Likins
High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o
Jan 1, 2000
-
Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - SynopsisBy S. R. Nandargikar
Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.
Jan 1, 1996
-
Producing Sealing Walls And Sealing Slabs By Applying The Soilcrete ProcessBy E. W. Raabe
The paper discusses the increasing role of specialist grouting techniques to form water seals or cut-offs for deep basement construction. Raabe and Toth discuss the various grouting methods available
Jan 1, 1989
-
Design Equations For Laterally Loaded Piles Embedded In SandBy T. G. Davies
The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to
Jan 1, 2010
-
DYNA Force-An Elasto-Magnetic Sensor For Force Measuring Of Post Tensioning Ground AnchorsBy Lucian Bogdan
On many occasions during construction and service life of the structure, it is crucial to know the load in post tensioning tendons and anchors. Although there are many methods to measure the tendon fo
Jan 1, 2009
-
An Alternative Pile TechnologyBy Rimas Veitas, James Panton, Erich Steinlechner
"Ductile Iron Piles (DIPs) are a proven, viable alternative to conventional piles, and for the past five years have been successfully used throughout New England. The installation process of DIPs lend
Jan 1, 2017
-
Pile Foundations for the San Francisco 49ers NFL StadiumBy Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The new San Francisco 49ers Levi’s Stadium is part of the next generation of sporting facilities. Constructed in Santa Clara, Calif., the new structure has 68,500 open-air bowl seats and includes a 7
Jan 1, 2014
-
Verification of Installation and Performance of ACIP Piles for BridgesBy W. Morgan NeSmith
"The DFI ACIP Pile Committee, in conjunction with the Florida DOT, completed an ACIP Pile installation monitoring and performance test program in late 2016 to advance the inclusion of ACIP piles in fu
Jan 1, 2017
-
The Role Of Real-Time Instrumentation In Large Infrastructure ProjectsBy J. G. La Fonta
The rapid development of real-time monitoring technology for the construction of large underground structures in urban areas can be attributed to: the zero-risk objective, the need for transparency be
Jan 1, 2006
-
RC Harris Water Filtration Plant Expansion Excavation Support Design, Installation And PerformanceBy Matthew Janes
The RC Harris Filtration Plant, which treats the majority of the fresh water for over 2.5 million Torontonians, is a Canadian Architectural Heritage site demonstrating a classic example of Art Deco A
Jan 1, 2006
-
Augered Cast-In-Place Pile Load Tests On The Cincinnati, Ohio/Northern Kentucky RiverfrontBy Theodore W. Vogelpohl
Augered cast-in-place piles have proven to be effective, adaptable and economical for projects throughout the Ohio River Valley. Specifically, they have been used extensively for high-rise structures,
Jan 1, 2005
-
Ground Freezing In Urban Areas And Under Special ConditionsBy Frank Haehnig
Ground freezing is a technique which is used more and more in tunnelling under complex ground conditions. This paper will present three case studies which highlight different aspects of the ground
Jan 1, 2008
-
North American Geotechnical Exploration Practice ? SynopsisBy C. O. Riggs
Geotechnical exploration in North America, in particular, exploration for deep foundations analyses, is currently and generally performed following the most basic sampling and insitu testing methods a
Jan 1, 2010
-
Improvement Of Bearing Capacity Of Bored Piles By Grouting MethodBy Andrzej Tejchman
A method of improvement of a subsoil under bored pile base by injection is presented. The method employs a special chamber attached to the reinforcement at the bottom of the drilled borehole. The cham
Jan 1, 2002
-
Micropile Performance Variability: A Fundamental Case StudyBy Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002