Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Vibration Control During the Construction of an In-Pit Lime Kiln (8311e31c-6f16-4a2a-8cda-6570ebbd2b33)

    By Paul Worsey, Ron Ecklecamp, Scott G. Giltner, Ronnie Inman, Terry Drechsler

    A blast monitoring program conducted at Chemical Lime Companys new lime calcining facility near Ste. Genevieve, Missouri is discussed. The purpose was to develop blasting criteria for the construction

    Jan 1, 1996

  • ISEE
    Determination of Dynamic Pressure and its Effect on Blasting

    By Ignacio Humeres Valdivia, Alejandro Ferrada Vergara

    In the latest years, the use of innovative blasting techniques has become more frequent in mines all over the world. Such techniques allow the miner to be more aggressive in the distribution of explos

    Jan 1, 2015

  • ISEE
    Mine Blasting at the British Columbia Institute of Technology

    By Christian Dye

    "The following paper focuses on the developing relationship between the members of theInternational Society of Explosive Engineers (ISEE), and the mining students from the BritishColumbia Institute of

    Jan 1, 2016

  • ISEE
    Suggestions for Successful Cut Blasting

    Blasting in a development heading or breasting operations starts from a cut. The void created by the cut provides a free face for the remainder of the round. It is the most critical part of the round

    Jan 1, 1995

  • ISEE
    Seed Wave Modeling to Natural Caves Protection in Mining Operations

    By Alejandro Rosario, Ricardo González

    The restrictions imposed by the Brazilian environmental legislation regarding natural caves lead to a block of substantial amount of mineral reserves. Mining activities can released caves, as long as

    Jan 1, 2019

  • ISEE
    Wave Analysis and Determination of Interference Times to Minimize the Impact of Vibrations

    By Carlos Pañura, Michael Geldres, Alejandro Rojas

    In this current era of production in large volumes of surface mining, which demands the realization of large-scale blasting, the mining industry must deal with the impact of the vibrations generated b

  • ISEE
    String Loading at Vale

    By Jennifer Paukula, Steven Lindsay, S. Joon Kim

    String loading is the placement of a bead or ‘string’ of emulsion along the lower edge of a development drill hole. The loading hose extraction rate controls the amount of emulsion placed in each dril

    Jan 1, 2012

  • ISEE
    Proactive Controls for Highwall Stability

    By Trevor Ames

    Highwall instability, and sometimes referred to as ground failures, historically are a consistent contributor of mine injuries and fatalities within surface mines. To combat this several efforts, incl

    Jan 1, 2015

  • ISEE
    A Laboratory Comparative Study of Slurries, Emulsion, and Heavy AN/FO Explosives

    By R Heater, G Glynn

    Various small diameter commercial grades of slurry and emulsion explosives were tested and compared. Velocity diameter curves for confined and unconfined charges were established and the effects of te

    Jan 1, 1984

  • ISEE
    Various Methods of the Ground Vibration Assessment

    By Dworzak, Andrzej Biessikirski, Jozef Pyra

    During the detonation process 20-30% of the energy is being consumed only on the quarrying pro-cess. The remaining amount of the energy generates harmful effects such as: shock wave, acoustic wave, fl

    Jan 1, 2015

  • ISEE
    Reinforced Concrete Structure Failure Mechanisms Resulting from Explosively-Induced Overpressure

    By Dale Preece, Vanessa Berg

    This paper presents a two-pronged vulnerability analysis approach for treating minimally reinforced concrete (RC) structures subjected to explosive events. This work was motivated by a heightened inte

    Jan 1, 2004

  • ISEE
    Digital Tunnel Blasting in a Sensitive Environment: N1 Porto Tunnel Project, Portugal

    By Yannick Bleuzen, Manuel Joao, Frederic Monath, Miguel Quaresma

    The N1 Porto tunnel project is a 650m segment of large-scale civil engineering plan to improve traffic flow between Porto’s downtown district, the Santo Antonio hospital district and the highway acces

    Jan 1, 2005

  • ISEE
    Bio-fuel ANFO-Explosive alternative for a green world

    By Dale Ross, Bill Clements, Jim Spanos

    Current world conditions are forcing the search for "green" energy technology in every aspect of our daily lives. Finding alternatives to petroleum fuels seems to be at the top of the list. The search

    Jan 1, 2012

  • ISEE
    The Application of Pumpable Emulsions in Narrow Reef Stoping

    By Selwyn Pearton

    Pumpable emulsion explosives have been available to surface and underground massive mining operations for decades and through their unique properties offer significant advantages through improved safe

    Jan 1, 2015

  • ISEE
    Application of Automated and Centralized Rock Fragmentation Analysis

    By Matthew Baumann, Bahram Sameti, Tafazoli Zeng Hairong, Edmond Chow

    An automated, centralized, image-based rock fragmentation analysis system provides blast engineers with the benefit of minimizing tedious and mundane work, and allows them to focus on their expertise

    Jan 1, 2013

  • ISEE
    Production Drilling and Blasting Techniques at the Escalante Silver Mine

    By Eddie L. Catbagan

    The Escalante silver-bearing deposit, consisting of a relatively wide and continuous quartz vein, contains openings ranging from minute to a few feet wide on the footwall and hanging wall. These openi

    Jan 1, 1983

  • ISEE
    Journal: 100 Years / E.I. du Pont de Nemours Powder Co. Wilmington, Del 1910

    By Robert Hopler

    INTRODUCTION NOT so very many years ago the farm was about the last place where one would expect to find up-to-date mechanical appliances. Steam, explosives, electricity—the factors which have made th

    Jan 1, 2011

  • ISEE
    Detonator Safety Relation to Measurement Errors

    By James G. Stuart, Tassilo N. Baur

    We will discuss the kind of procedure that we use to predict the no-fire (for safety) and all-fire (for reliability) current levels for any given type electric detonator. The basic idea is to expose s

    Jan 1, 2019

  • ISEE
    Streamlining Processes, Increasing Security, Productivity, and Process Transparency by Using Digital Logistics Solutions within the Supply Chain of Civil Explosives

    By Frank Hirthammer

    Over the past few years, development and implementation of digital logistics solutions has convinced users of many additional advantages of this technology. Barcode labeling and reading increases the

    Jan 1, 2018

  • ISEE
    Protection from Liability Before, During, and After Blast Detonation

    By Ralph E. Burnham, J. Kelly Ratliff

    "The words “dynamite,” “TNT,” “explosives,” and “blasting” typically cause the general public, andjurors, apprehension and fear. Although blasting operations conducted by well-trained, skilled, andexp

    Jan 1, 2016