Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Signature Hole Method for Ground Vibration and Airblast in Mine Blasting; Convolution or Superposition?

    By B T. Lusk, John J. Silva Castro

    The signature hole method uses a convolution operation to predict the waveform of a production blast based on the record of a waveform produced by a single blast hole. Convolution is a mathematical op

    Jan 1, 2014

  • ISEE
    Precision Presplitting: Explosive Load Variations with Spacing

    By Calvin Konya, Anthony Konya

    Presplitting is a form of blasting that when executed properly will create a smooth wall that will minimize secondary conditioning. In recent years, presplitting has become a popular technique to be u

    Jan 1, 2017

  • ISEE
    Close Proximity Trench Blasting Case History

    By Andrew F. McKown, Robert A. McClure

    This paper will describe a trench blasting case history in close proximity to several adjacent structures, including a bridge abutment, railroad tracks, and utility pipes. Some design considerations i

    Jan 1, 1988

  • ISEE
    Blast Design and Quality Control Procedures at Atomic Energy of Canada Limited's Underground Research Laboratory

    By P A. Lang

    Canada is constructing an Underground Research Laboratory as part of a comprehensive program to evaluate the concept of nuclear fuel waste disposal deep in stable rock formations. Careful blasting met

    Jan 1, 1987

  • ISEE
    Anfo Truck Burn Trials

    By E. Contestabile, B. von Rosen

    Recently, the Canadian Explosives Research Laboratory (CERL) completed its investigation of a truck accident, which involved 18,000 kg of commercial explosives, 13,000 kg of which was ANFO. Over the t

    Jan 1, 2004

  • ISEE
    Cast Blasting Advances and Challenges at Arco's Black Thunder Mine

    By Robert L. Martin, Brian W. Stump

    "The Black Thunder Mine is located in the Powder River Basin of Northeastern Wyoming. Over 39.2million tons of coal were produced at the Black Thunder Mine in 1996. Just over 100 million pounds ofANFO

    Jan 1, 1997

  • ISEE
    Recent progress with the European Directive on Pyrotechnic Articles (4e894ebd-b782-4676-b2a7-043caaabc442)

    By R. Wharton, M. Bagley

    Following a series of papers relating to the certification of explosives for sale in member states of the European Union presented at previous ISEE conferences, this poster paper has been prepared to

    Jan 1, 2008

  • ISEE
    The Application of Transfer Functions in the Prediction of Structural Response to Blast Induced Ground Vibration

    By Robert A. Farnfield

    This paper outlines the theory behind transfer functions and illustrates their application in the prediction of structural response to blast induced ground vibration. The ability to predict the respon

    Jan 1, 1994

  • ISEE
    Vibration Damage Near Dwellings in Overland Park, Kansas

    By D G. Dressler, Paul Yeager

    A previously little-known facet of seismic frequency spectrum analysis is gaining significance. The frequency spectrum of seismic waves promulgated from blasting is a significant factor in causing bla

    Jan 1, 1987

  • ISEE
    Ammonium Nitrate in Mine Water: A Case Study

    By Carlos Agreda

    "In the present article a case study of ammonium nitrate in mine water is briefly analized and discussed. Causes of mine water pollution from AN are very well identified and emphasized.Some preventati

    Jan 1, 1999

  • ISEE
    Drill/Blast Hands-On Teaching

    By D Reid Watson

    A unique blend of theory and hands-on teaching of blast hole drilling and explosives technology is being provided at a Canadian Community College. Students graduate at an apprentice level quite capabl

    Jan 1, 1987

  • ISEE
    Relating Explosives Sensitivity Laboratory Results to Field Tests

    By R R. Vendebeek

    The continuing evolution of explosives has most recently introduced emulsion explosives and heavy ANFO's to the market place. An explosives engineer has a multiplicity of explosives to choose from: dy

    Jan 1, 1987

  • ISEE
    Research on Program Design for Control Blasting of Reinforced Concrete Frame Structures

    By Wang Hao

    "Demolition of reinforced concrete frame structures in building crowded cities is a hardproblem in control blasting. Any mistakes, e.g. wrong toppling direction of multi-storeybuilding or incompleted

    Jan 1, 1993

  • ISEE
    Blasting to Initiate Block-Caving in Serpentine

    By Terry Matts, Henry Heidrich, Cluny Randell, Carl Kottmeier

    Until 1990, all production of asbestos ore at Cassiar was by open-pit methods. With the impending exhaustion of open-pit reserves, a decision was made in February 1988 to continue mining underground,

    Jan 1, 1992

  • ISEE
    Storage of Technical (Porous) Ammonium Nitrate

    By Erik Nygaard

    During the last years, ammonium nitrate has been involved in several accidents worldwide. This have caused increased focus on security and safety issues and resulted in:• Revised Yara standards • Revi

    Jan 1, 2008

  • ISEE
    Targets for Blast Fragmentation Models

    By J P. Tidman

    The problem of blasting fragmentation has received a good deal of attention in recent years. Progress by the scientific method requires a good set of experimental data as a benchmark to test models. R

    Jan 1, 1991

  • ISEE
    Optimum Design Features of Controlled Trajectory Blasting (CTB)

    By T N. Hagan

    Where explosion energy moves rock from the in-situ to its desired location without considerable assistance from digging and/or hauling equipment, good fragmentation is of minor importance. Maximum dis

    Jan 1, 1979

  • ISEE
    Contour Blasting in Tunneling: the Role of Drilling Precision

    By Mauro Fornaro, Marilena Cardu, Renato Mancini, Daniele Castano

    Tunneling by explosive blasting in civil works isn't merely intended to break somehow a way through the rock, rather to drive a permanent, constant cross section, lined way. The current mechanical exc

    Jan 1, 1992

  • ISEE
    Cumberland Gap Tunnels; Controlled Excavation With Complex Geology

    By Tom Short

    The contract to drive twin 4,100 foot (1250.5m) long tunnels under the existing Cumberland Gap highway was awarded to a Joint Venture of S.A. Healy of Chicago, Illinois and Lodigiani USA of Fairfax, V

    Jan 1, 1993

  • ISEE
    Rapid Advance - 113 Foot Raise in 3.5 Shifts

    By Mike McGill, Steven P. Case, Mark Spaulding

    The General Crushed Stone Company at Doswell VA. decided to open a new pit to expand their reserves. The elevation of the property was 136 feet above the present primary crusher. The project required

    Jan 1, 1993