Abstract
The contract to drive twin 4,100 foot (1250.5m) long tunnels under the existing Cumberland Gap highway was awarded to a Joint Venture of S.A. Healy of Chicago, Illinois and Lodigiani USA of Fairfax, Virginia in January of 1991 under a $51.8 million bid. Due to very complex geological conditions, there were six distinct categories of excavation, the New Austrian Method of ground support was utilized throughout.