Rapid Advance - 113 Foot Raise in 3.5 Shifts

- Organization:
- International Society of Explosives Engineers
- Pages:
- 4
- File Size:
- 62 KB
- Publication Date:
- Jan 1, 1993
Abstract
The General Crushed Stone Company at Doswell VA. decided to open a new pit to expand their reserves. The elevation of the property was 136 feet above the present primary crusher. The project required driving twin tunnels under the highway to access the primary crusher from the new property. A shaft was needed to pass blasted rock to the tunnel elevation where it's loaded and hauled to the primary crusher. In addition, a ventilation shaft was required to provide adequate airflow. Dynatec Mining Contractors Inc. Lakewood Colorado was subcontracted to handle the tunnel and shaft development.