Deep Mixing Ground Improvement Design to Support Large MSE Walls for Kitimat LNG, BCBy Randy R. Williams, Roberto R. Olivera, Brian W. Wilson, Marina S. W. Li
"An extensive, deep mixing (DM) ground improvement program using the Cutter Soil Mixing (CSM) technique was designed and constructed in 2013 to support up to 20 m (66 ft) high Mechanically Stabilized
Jan 1, 2017
-
A New Analysis Of Data From Statnamic Tests On Piles In ClayBy William F. Anderson
A series of pile load tests (maintained load tests, constant rate of penetration tests at different rates, and statnamic tests) was carried out on an instrumented model pile installed in clay beds pre
Jan 1, 2006
-
Construction Of Long Tubular Column Foundations Under Deep Water ? SynopsisBy C. L. Liao
The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter
Jan 1, 2010
-
Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle EastBy Brian Metcalfe, Kord Wissmann, Gianni Martinez
The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large
May 1, 2022
-
Non-Linear Analysis Of Laterally Loaded Piles: Calibration Of A New MethodBy Vasileios A. Drosos
The response of pile foundations to lateral loads is an important factor for the successful performance of several critical structures. A new numerical code for the analysis of single piles under late
Jan 1, 2006
-
Lateral Forces on Pile Due to Soil Slope CreepBy David E. Albus, Bidjan Ghahreman
A single-family home constructed on the side of a slope in Los Angeles, CA, was subjected to lateral forces due to soil slope creep on the pile foundation supporting the home. Impacts to the property
Jan 1, 2018
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging ProjectBy José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015
-
Army Corps Mega Projects Benefits From Innovative FoundationsBy Dale Berner, Michael O’Sullivan
"This paper focuses on lessons learned from the innovative designs, in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers, USACE, Megapr
Jan 1, 2017
-
Kosciuszko Bridge Main Pylon Deep Foundation SolutionBy A. Daugiala, D. Coleman
In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E
Jan 1, 2016
-
Performance Of Three Unique Shoring Sections For Block 75 ShoringBy Chris Sammon
The Block 75 portion of the City Creek redevelopment project in Salt Lake City required multiple shoring walls surrounding the 6 acre site constructed to depths ranging from sixty-five to ninety feet
Jan 1, 2010
-
Design and Construction of the New VDOT Midtown TunnelBy Rick Ellman, Ian Chaney
"The Hampton Roads area encompassing the Norfolk, Virginia Beach and Newport News metropolitan region experiences some of the worst traffic congestion in Virginia. With continued growth of the ports a
Jan 1, 2014
-
A Review Of Diaphragm Wall Construction-White Swan Hotel ? SynopsisBy Q. M. Huang
In 1979 our company undertook the project of infra-structural work of White Swan Lake Hotel, (International class ) Guangzhou. Visit to the site showed that it was situated at the riverside, covering
Jan 1, 2010
-
Ground Improvement by a Combination of a Mixed-In-Place (MIPTM) Lattice Grid Wall and Stone Columns to Mitigate the Risk of Liquefaction and Lateral SpreadingBy Noreen Tarac, Pablo Forgoso, Philipp Schober
A multiple use storage facility building is being developed in the Philippines on a peninsula that was reclaimed in the 1990s without any soil treatment. The subsoil now consists of loose to medium de
Sep 8, 2021
-
Analysis of Water Leakage in Downstream Dam Toe of Komani DamBy Arjan Jovani, Arjan Beqiraj, Përparim Alikaj, Altin Karriqi
"Koman dam is one of most important high dams in Drin River Cascade. Safety of these dam is very important not only in power production but also in social and environmental aspects connected with vita
Jan 1, 2016
-
Estimation Of Wind Turbine Foundation Rotational Stiffness Based On Fully Non-Linear Dynamic AnalysisBy Yazn Khasawneh Ph. D. P. E., Will Tjaden, Spencer E. Ness P. E., Mohammed Nasim Ph. D. P. E.
Wind turbine components undergo many loading cycles during their operational life. Additionally, wind turbines may undergo extreme loading conditions from natural hazards, mechanical failures, or emer
Oct 1, 2022
-
Liquefaction Mitigation Synthesis ReportBy Timothy C. Siegel
This report presents the results of a synthesis on the design and analysis of ground improvement for liquefaction mitigation. The synthesis included an industry survey concerning the practice of groun
Aug 1, 2013
-
Case History: Effect Of Plastic Clays On The Behavior Of APGD Piles In Central FloridaBy Amr M. Sallam
In recent years, with the increase of the number of high-rise buildings that are proposed and being built in Central Florida especially in Downtown Orlando, Augered Pressure Grouted Displacement (APGD
Jan 1, 2006
-
Drilling And Dewatering In An Urban Environmentprivate - Project Description And LocationBy Joel Moskowitz
In 1990, the United States General Services Administration (GSA) issued a contract for design and construction of a new federal court building in New York City. Mueser Rutledge Consulting Engineers (M
Jan 1, 1996
-
Dewatering Practice For Deep Basements In HawaiiBy Masanoub R. Fujioka
A brief discussion of the methodologies involved in dewatering practices, particularly as used in Hawaii in coralline formations. A description of early dewatering practices includes a number of case
Jan 1, 1986
-
Elimination of Environmental Footprint: LVCC Expansion - Foundation InstallationBy Zachary Q. Maassen
Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Conventio
Jan 1, 2019