Search Documents

  • SME
    Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies

    By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani

    The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th

    Jan 1, 2001

  • TMS
    Thermo-Mechanical Coupling Finite Element Analysis of Sheet Metal Extrusion Process

    By C. Y. Tang, Z. H. Chen, T. C. Lee

    "In sheet metal forming process, the forming limit and strain distribution are governed by plastic instability and fracture following strain localization. It has been proved that the temperature gradi

    Jan 1, 2001

  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • DFI
    Presentation #2 - Non-Destructive Testing For Drilled Shafts - Contents

    By Frank Rausche

    Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world

    Jan 1, 2001

  • AUSIMM
    Wall Control Blasting Practices at BHP Billiton Iron Ore Mt Whaleback

    By C T. Dunbar, P A. Walker, G E. LeJuge

    A programme of blast improvement was initiated at the Mt Whaleback iron ore mine by BHPIO management in early-1998. One component of that work was the need to improve wall control blasting practices t

    Jan 1, 2001

  • AUSIMM
    Design of the Second Block Cave at Northparkes E26 Mine

    The pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur

    Jan 1, 2001

  • TMS
    Study of EDT A Complexed Electroless Copper Plating for ULSI and Electronics Applications .

    By In-Ho Chi

    In copper metallization, resistivity of copper seed layer is very important since the thickness of seed layer is less than 200iun. Conventionally MOCVD has been used for this purpose however electrole

    Jan 1, 2001

  • SME-ICGCM
    Effects Of Bedding Plane Sliding And Separation And Tensioned Bolt In Layered Roof

    3-D finite element modeling was performed to study the effect of bedding plane sliding and separation and tensioned bolt in layered root It was found that the major influence zones of a tensioned bolt

    Jan 1, 2001

  • SME
    Mechanical Mining In Hard Rock: A Glimpse Into The Future

    By R. J. Robbins

    The mechanization of hard rock underground mines offers a large potential for reducing cost, improving efficiency, and increasing profitability. However, in spite of serious efforts by quite a number

    Jan 1, 2001

  • TMS
    Dynamic Model for a Vapor Recovery in Carbo Thermic Aluminum Process

    By B. Erik Ydstie, Tor Lindstad, Vianey Garcia-Osorio

    "As a result of the high temperatures present in a Carbothermic Aluminum Process the content of aluminum and aluminum sub-oxide in the gases leaving this process is high. These gases as well as energy

    Jan 1, 2001

  • SME-ICGCM
    Estimation Of In-Situ Stress At Ikeshima Colliery Using AE And DRA Method

    By Hideki Shimada

    A low cost methodology that allows the determination of in- situ stress using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stages

    Jan 1, 2001

  • SME-ICGCM
    Injection Techniques for Cost-effective Stabilization of Brittle and Faulted Strata Zones

    By Martin Bolesta

    The use of strata injection as a means of stabilizing brittle and heavily stressed ground as well as faulted zones is now state-of-the art technology. Users are obliged to select the right combination

    Jan 1, 2001

  • RMCMI
    2001 RMCMI Mine Rescue Performance Evaluation

    The tenth annual Mine Resale Evaluation was held in conjunction with the RMCMI 2001 convention at the Steamboat Springs Sheraton Resort, Steamboat Springs, Colorado June 23 through 26. The purpose of

    Jan 1, 2001

  • AUSIMM
    Industrial Minerals Derived from Volcanic Rocks in New Zealand

    By T Christie

    Tertiary volcanic rocks make up a significant proportion of the surficial cover rocks of New Zealand, especially in the Taupo Volcanic Zone. Industrial minerals that are associated with or derived fro

    Jan 1, 2001

  • CIM
    Using airborne magnetic and electromagnetic data to monitor mine tailings in Copper Cliff, northern Ontario

    By J. Shang, P. Howarth, B. Morris

    Tailings from the nickel refinery in Copper Cliff, Ontario, consist of fine silicates mixed with a variable amount of conductive and magnetic minerals mainly associated with sulphides and iron oxides.

    Jan 1, 2001

  • SME-ICGCM
    Systems Used In Coal Mining Development In Long Tendon Reinforcement

    By Brian Clifford

    A wide range of different cablebolt systems are available and in use in hard rock and coal mines around the world. The birdcaged cablebolt was initially used in UK coal mines in conjunction with ro

    Jan 1, 2001

  • SME-ICGCM
    A New Rockbolt Axial Load Measuring Device

    By Hani Mitri

    A new monitoring device called SAFEBOLT (Stress And Force Evaluator in Bolts) has been recently developed. The device SAFEBOLT, essentially replaces the load cell, it permits the monitoring of bolt a

    Jan 1, 2001

  • DFI
    Presentation #3 - Cross-Hole Sonic Logging And Single-Hole Sonic Logging - Outline

    By Les R. Chernauskas

    ? What is Integrity Testing? ? Cross-Hole Sonic Logging (CSL) ? Single-Hole Sonic Logging (SSL) ? Typical Specifications ? Case Histories ? Observations and Conclusions WHAT IS INTEGRITY T

    Jan 1, 2001

  • SME
    Planning And Teamwork Lead To Successful Start-Up At Batu Hijau

    By P. Hickey, J. Spenceley, T. J. DeMull

    Development of the Batu Hijau Project was successfully completed in the fourth quarter of 1999 with the final handover and start-up of ore processing facilities. The development project had started m

    Jan 1, 2001

  • SME
    Class I Areas Impacts Analyses For A Proposed Expansion Of A Taconite Processing Facility In Northeast Minnesota

    By D. M. Wagner, G. Biggs, M. Osmundson, C. J. Twaroski

    Potential air emission impacts to federal Class I areas from distant sources are receiving increasing scrutiny by federal land managers (FLMs). This paper provides summary results of the impact analy

    Jan 1, 2001