Design, Commissioning, and Operation of a Heavy Rare Earth Separation Pilot PlantBy Jack Zhang, Yunguo Tang, Baodong Zhao
"Rare earth elements (REEs) have numerous key applications in both traditional and advanced technologies. A shortage of some critical REEs is expected due to the discrepancy between the REE abundance
Jan 1, 2017
-
Design, Commissioning, Start-Up and Performance of Vale’s Long Harbour Stirred Media Detritor Ultrafine Grinding CircuitBy Adam Moore, Ryan Gillespie, Jarrett Quinn, Audrey Walters, Peter Radziszewski
"Vale Long Harbour Processing Plant (LHPP) was designed to process Voisey’s Bay nickel concentrate into finished nickel and associated copper and cobalt products. The plant includes a secondary grindi
Jan 1, 2016
-
Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, ZimbabweBy Peter Makuvise, Alain M. Bantshi
"The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w
Jan 1, 2017
-
Design, Construction and Design Validation through High Strength Testing (PDA) of CFA and DD FoundationsBy Stefano Pirrello
"Sydney’s booming real estate market has pushed property developers to invest in historically “no-go” areas, which were previously too expensive to develop. These areas are usually near rivers where t
Jan 1, 1900
-
Design, Construction and Initial Operation of the Tailings System at Brenda Mines Ltd.By H. Tetu, F. Pells
"The copper-molybdenum property of Brenda Mines Limited is located in the Okanagan district of British Columbia, approximately 25 miles west of Kelowna. The Okanagan Valley is a resort and fruit-growi
Jan 1, 1971
-
Design, Construction and Monitoring of a Secant Pile Compression RingBy Jason Weck, Alper Turan, Ali Chehadeh
"Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro
Jan 1, 2014
-
Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? IntroductionBy M. D. Scott
Lornex Mining Corporation operates an open pit porphyry copper mine in the Highland Valley southwest of Kamloops with a rated capacity of 43 500 TPD (48,000 TPD). It went into production in April 1972
Jan 1, 1976
-
Design, Construction and Performance of a Passive Treatment System for the Reduction of Acidity and Dissolved Metals in Acid Sulfate Soil WaterwaysBy M D. Melville, B C. T Macdonald, T D. W
The surface waters in regions with acid sulfate soils (ASS) can contain high concentrations of acidity and dissolved metals. These soils cause problems for agriculture, construction and development. T
Jan 1, 2003
-
Design, Construction and Performance of PKC Dams on Northern TerrainBy James W. Cassie
The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros
May 1, 2003
-
Design, Construction And Start-Up Of The Ilo Smelter Modernization ProjectBy H. Walqui, C. Noriega
Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000
Jan 1, 2007
-
Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry PracticeBy Martin D. Larisch, Ronald Damen
The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre
May 1, 2022
-
Design, Construction Challenges and Quality Control of a Deep Soil Mixing System for Waterfront Slope StabilizationBy Yan Lap J. Kan
"A waterfront stabilization system consisting of Deep Soil Mixing (DSM) columns, vinyl sheet pile fascia, and concrete flood walls supported on shallow footings was designed and constructed for a high
Jan 1, 2016
-
Design, Construction, and Commissioning of Air Separation Units in Remote LocationsBy K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko
In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located
Jan 1, 2014
-
Design, Construction, And Instrumentation Of An Atypical A-Frame Micropile Wall In Aspen, ColoradoBy Kyle Kershaw
Micropiles are routinely used in the United States for foundation support and stabilization of slopes. In recent years, several retaining walls have been constructed using micropiles in an A-frame ty
Jan 1, 2007
-
Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, GeorgiaBy Cheng Lin, Guoming Lin
"This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (
Jan 1, 1900
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017
-
Design, Construction, and Start-up of Stillwater Mining’s East Boulder ConcentratorBy P. Lefebvre, J. Sargent, K. Major, B. Darnton
"Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin
Jan 1, 2003
-
Design, Construction, And Testing Of A Precast UHPC PileBy Thomas L. Vande Voort
The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in br
Jan 1, 2008
-
Design, Construction, Commissioning And Operating Of the Elura ConcentratorBy Morrison R. D
This paper describes major events in the design, construction, camtissioning and operation of the Elura concentrator. It covers the period fran September, 1974 when laboratory testwork on drill co
Jan 1, 1983
-
Design, Development and Operation of a Hardrock RoadheaderBy Bromley JC
Eimco Great Britain, a division of Baker Mining Equipment Company, was contracted to develop a hardrock tunnelling machine in conjunction with British Coal. The objective: a machine to cut rock up