Search Documents

  • CIM
    Design of SO2/O2 Cyanide Destruction Circuits: The Critical Factors and Challenges

    By N. Katsikaros, N. S. ‘ Yap, B. Adaszynski

    "Cyanide is a well proven, effective lixiviant that has been utilised for centuries in gold extraction processes. Despite being used in close to 90% of gold processing plants, cyanide leaching is stil

    Jan 1, 2016

  • CIM
    Design of Solution Heat Treatments for Aerospace Alloys

    By J. Beddoes

    Many high strength aerospace alloys undergo solution heat treatment (SHT) and aging to develop precipitate strengthening. Most simply, SHT involves an isothermal hold in a single phase region followed

    Jan 1, 2010

  • SME
    Design Of Stillwater Mining Company’s East Boulder Mine

    By D. Einarson, B. Strickland

    The decision to accelerate development of Stillwater Mining’s East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished thr

    Jan 1, 1999

  • TMS
    Design Of Supersonic Nozzles For Ultra-Rapid Quenching Of Metallic Vapours

    By M. N. H. Khan

    CSIRO has been experimenting with supersonic flows as a method of rapidly quenching metallic vapours. Cooling rates above 106 °C/s have been achieved. The supersonic flow conditions are achieved by ad

    Jan 1, 2006

  • AIME
    Design Of Surface And Near-Surface Construction In Rock

    By A. J. Hendron, D. U. Deere, F. D. Patton, E. J. Cording

    In the design of structures founded in the near-surface rock, a distinction may be made between those problems that are related to the strength of the rock mass, and those that are related primarily t

    Jan 1, 1967

  • CIM
    Design of Teach Pendant for Robot Glazing System

    By Seungyeol Lee

    Currently, a new construction method using a robotic system is widely spreading in construction sites. This study is related to the design of glazing robot?s teach pendant which can improve convenienc

    Aug 1, 2013

  • CIM
    Design of the AGA Brasil Refractory Gold Pressure Oxidation Plant

    By I. Masters, K. Buban, M. Faris, M. Antonio, M. Collins

    "AngloGold Ashanti Brasil, with assistance from Sherritt International Corporation, has recently commissioned a new autoclave for the pressure oxidation of refractory gold feeds at their Corrego do Sí

    Jan 1, 2012

  • SME
    Design of the Akron Northside Interceptor CSO Tunnel - RETC2023

    By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote

    The City of Akron will construct the Northside Interceptor Tunnel project, a U.S. EPA/ DOJ CSO Long Term Control Plan Project. The system will provide at least 10.3 million gallons of storage in a 16.

    Jun 13, 2023

  • DFI
    Design Of The BMIP Boat Section - Introduction

    By Kenneth Pidgeon

    The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.

    Jan 1, 1994

  • SME
    Design of the Brightwater Conveyance Tunnels

    By Leon Maday, Dan L. Pecha, Jeremy Johnson, Daniel N. Adams

    The Brightwater conveyance system includes 26 km of tunnels, a 130 mgd pump station, 2 km of micro tunnels, and a 2.4 km outfall. The tunnels extend from Woodinville to Puget Sound through varying soi

    Jan 1, 2005

  • SME
    Design Of The Conda, Idaho Phosphate Rock Processing Mill

    By A. Guzman

    The design and construction of a new 140-ton-per-day R. O. M. phosphate rock scrubbing and washing plant was undertaken by Western Knapp Engineering Company, a Division of Arthur G. McKee and Company,

    Jan 1, 1969

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • SME
    Design of the Epping to Chatswood Rail Line, Sydney, Australia

    By Jim Rozek, Robert A. Gee

    The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc

    Jan 1, 2005

  • DFI
    Design Of The Foundation Of Zhu Jiang Fanying High-Rise Building Complex ? Synopsis

    By A. F. Deng

    A general description of the project, mainly the pier foundation design of the ZHU JIANG FANYING is presented in the paper. The major contents include the foundation scheme, the evaluation of bed-rock

    Jan 1, 2010

  • SME
    Design Of The Geologic Program At The Zortman And Landusky Mines, Little Rocky Mountains, Montana

    By M. Stephen Enders

    The Little Rocky Mountains host epithermal gold-silver bearing vein and stockwork deposits in a syenite intrusive complex. Pegasus Gold Ltd. is currently mining the oxidized deposits by open-pit metho

    Jan 1, 1983

  • SME
    Design of the High Capacity, Horizontally Curved Overland Conveyor at Batu Hijau

    By Philip K. Chan

    Batu Hijau is a new copper and gold mine located on the island of Sumbawa in the Republic of Indonesia. This paper details the design and construction of the Batu Hijau overland conveyor, one of the m

    Jan 1, 2000

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • SME
    Design Of The Leadville Concentrator

    By Donald Crowell

    Due to falling metal prices and depletion of ore reserves, lead-zinc mining in the Leadville, Colorado, area gradually came to a halt in the 1950's. Exploration work continued, however, and by 19

    Jan 1, 1972

  • DFI
    Design of the Lift-in Dam at Olmsted on the Ohio River

    By Dale E. Berner

    A new navigation dam at Olmsted on the Ohio River will be built "in-the-wet" using a lift-in construction method by the Washington Group/Alberici Joint Venture for the U.S. Army Corps of Engineers, Lo

    May 11, 2007

  • DFI
    Design Of The Marine Foundation For The Skyway Project Of The San Francisco Oakland Bay Bridge

    By Gerry Houlahan

    The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde

    Jan 1, 2005