Design of the Akron Northside Interceptor CSO Tunnel - RETC2023

Society for Mining, Metallurgy & Exploration
David Mast Heather Ullinger Amanda Foote Juan Granja Dominick Mandalari
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
16
File Size:
282 KB
Publication Date:
Jun 13, 2023

Abstract

The City of Akron will construct the Northside Interceptor Tunnel project, a U.S. EPA/ DOJ CSO Long Term Control Plan Project. The system will provide at least 10.3 million gallons of storage in a 16.5-foot finished ID and 6,660-foot-long rock tunnel. The system will reduce both overflow volume and number of overflow structures on the Cuyahoga River. The project includes deep drop shafts and more than 3,000 linear feet of 48 to 96-inch I.D. sewers installed by trenchless construction methods. This paper will discuss the project background, ground conditions, and other challenges overcome during the design phases.
Citation

APA: David Mast Heather Ullinger Amanda Foote Juan Granja Dominick Mandalari  (2023)  Design of the Akron Northside Interceptor CSO Tunnel - RETC2023

MLA: David Mast Heather Ullinger Amanda Foote Juan Granja Dominick Mandalari Design of the Akron Northside Interceptor CSO Tunnel - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account