Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction of a Unique Shaft Bottom Structural System for a Potash MineBy E. Nolasco, J. Ouellet, T. Tikka
"Shaft bottom structural systems are used in underground mining to support transfer of personnel, equipment and ore to and from underground to the surface. This paper first summarizes the evolution of
Jan 1, 2019
-
Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) WallBy Allan Sylvester
Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel
Jan 1, 1997
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - SynopsisBy N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Design and Construction of Deep Shaft Concrete Linings in the UKBy F. A. Auld
"During the period 1958-1980 seven deep shafts were sunk from the surface in the UK. From 1977 until 1989 sixteen deep shafts were sunk in the UK, all concrete lined. Subsequently from 1989 up to the
Jan 1, 2019
-
Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro ClayBy Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong
"Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al
Jan 1, 2017
-
Design and Construction of Dulles Airport TunnelsBy Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field
With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn
Jan 1, 2007
-
Design And Construction Of Earth Bottom ThickenersBy Edward S. Hsia
Pluor Utah has been closely associated with the engineering and construction of earth bottom thickeners for porphyry copper operations, for the counter-current decantation circuit of a gold cyanide pl
Jan 1, 1977
-
Design And Construction of Emergency Pedestrian Egress Tunnels, Essex Junction, VermontBy Bradford F. Townsend, Robin B. Dill, Richard M. Croswell
Innovative geotechnical construction techniques were used to construct three pedestrian tunnels under a building slab-on-grade to allow utilization of basement space for manufacturing. Tunnels were co
Jan 1, 1993
-
Design and Construction of EPB Tunnels Within an Artesian Groundwater Aquifer - Addressing Environmental IssuesBy Adrian Coombs
The York Durham Sewage System (YDSS) Interceptor Tunnel Project is located in the Town of Richmond Hill, Ontario, Canada, just north of Toronto. Construction commenced in September 2006 and completion
Jan 1, 2008
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric ProjectBy James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
Design and Construction of Hydrostatic Mine Shaft Liners Using Cast Iron Tubbing TechnologyBy J. Ouellet
The design of hydrostatic liner for a deep potash mine shaft in Saskatchewan poses tremendous technological challenges. Technology has evolved to a point where one could consider a new innovative appr
Aug 1, 2013
-
Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury BridgeBy Frederick C. Rhyner
Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw
Jan 1, 2004
-
Design And Construction Of Lake Mead Intake No. 3 Shafts And TunnelBy Jon Hurt
INTRODUCTION The entire scope of new facilities for Lake Mead Intake No. 3 includes a sub-merged intake structure, a deep tunnel beneath Lake Mead, a tunnel access shaft, Intake Pumping Station No. 3
-
Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, MalaysiaBy B Chapman, B Gaida, L Drowley
The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw
Sep 17, 2014
-
Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich BridgeBy Andrew Peterson
The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi
Jan 1, 1999
-
Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022By M. Trim, Y. Sun, D. Tepavac, A. Kumar
Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse
Dec 1, 2022
-
Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler
This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under
Jun 13, 2021
-
Design And Construction Of Micropiles Each Subject To 110 Kips Of Lateral LoadBy Andrew Baxter
The Crystal Bridges Museum of American Art in Bentonville, Arkansas is a beautiful glass and concrete structure cut into a valley that mingles with water ponds spanned by multiple bridges with suspend
Jan 1, 2008
-
Design And Construction Of Minghu Power CavernBy C. Y. Kao, Roger Y. Cheng, C. S. Hsieh
The mushroom-shaped Minghu power cavern located in central Taiwan is 21.2 m (W) by 40.5 m (H) by 127.2 m (L) and is designed to house 4 units of power generating-pumping equipment with a total capacit
Jan 1, 1983
-
Design and Construction of Mixed Ground Working Platform for a CCR Surface ImpoundmentBy Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste
An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D
Jan 1, 2019