Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Soil Nail Support Of Excavation System For The Embassy Of The Peoples Republic Of China In The United States

    By Giovanni A. Bonita

    The new Embassy of the Peoples Republic of China in the United States (Chinese Embassy) is located in the Embassy Row portion of Northwest Washington DC. The 475,000 ft2 (44,125 m2) struct

    Jan 1, 2006

  • DFI
    Innovative Riverbank Erosion Control Retaining Wall System for the Brazos River

    By Tracy Brettmann, Will Bohlen

    An innovative retaining wall design consisting of tangent drilled shafts with supplementary seal piles was used to limit continuing bank erosion along the Brazos River in Southeast Texas. The riverban

    Jan 1, 2018

  • DFI
    Pressure-Grouting Improves Performance of Helical Piles: A Production Case History, Static Load Test Results, and Comparisons to Predicted Lateral Deflection and Axial Resistance

    By Karen J. Dawson, Francisco Johnson

    "Pressure-grouted high strength helical displacement piles are a recently developed pile type that can be useful in conditions where noise or vibrations must be low or where access or clearance is lim

    Jan 1, 2016

  • DFI
    The Effect Of Overburden On Pile Capacity In A Calcareous Marl

    By William M. Camp

    An extensive design phase testing program in which 10 piles and 2 drilled shafts were instrumented and statically load tested to failure, was undertaken to establish relevant foundation design paramet

    Jan 1, 1993

  • DFI
    Atlantic Wharf: Redevelopment Of A Historic Site On Boston's Waterfront

    By Lee S. Vanzler

    Atlantic Wharf involved the construction of a six-level underground parking garage and a 32-story high rise tower along the historic Boston Harbor waterfront. The site, historically known as ?Russia W

    Jan 1, 2011

  • DFI
    Wave Equation Analysis And Dynamic Monitoring - A Presentation At The Deep Foundations Institute?McGill University Symposium Montreal, September 1983

    By Bengt Fellenius

    The conventional wave equation analysis without control of the representativeness of the parameters to the actual conditions does not provide accurate results. However, the representatives can be vast

    Jan 1, 1984

  • DFI
    Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of Iraq

    By H. Meseck

    The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a

    Jan 1, 1989

  • DFI
    Quality Control Of Augered Cast-In-Place And Displacement Piles ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and augered displacement (AD) piles since the pile is

    Jan 1, 2002

  • DFI
    Continuous Grouting In Embedding Of Sheet Piles

    By Jouko L. Lehtonen

    Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m

    Jan 1, 2006

  • DFI
    Research on the Stability Analysis of TDM Column Composite Foundation Supported Embankment

    By Song-yu Liu, Chao Yan, Yong-feng Deng

    "In order to investigate the stability of embankment on soft subgrade improved by T-shaped deep mixed column composite foundation, the internal forces and failure modes of columns were analyzed on the

    Jan 1, 2015

  • DFI
    Recent Developments In Continuous Flight Auger Piling

    By P. H. Derbyshire

    The use of continuous flight auger piles has increased significantly in the U.K. to such an extent that it is now the most widely used method of constructing small diameter bored piles. This paper des

    Jan 1, 1989

  • DFI
    Behavior of Battered Piles under Lateral Loads in Sandy Soils

    By Jogeshwar P. Singh, Ahmed AlaaEldin, Mohamed Ashour

    The presented methodology allows the determination of the response of laterally loaded battered long piles in sandy soils based on the soil-pile interaction. The Strain Wedge (SW) model which was orig

    Jan 1, 2018

  • DFI
    Prediction And Calculation Of Construction Vibrations - Summary:

    By Mark R. Svinkin

    Construction-induced vibrations may be detrimental to adjacent structures and sensitive electronics operating nearby. Construction vibration sources have a wide range of energy and velocity, as a func

    Jan 1, 1999

  • DFI
    Improvement Of The Cost-Effectiveness Of H-Bearing Piles By Using High-Strength Histar Steels. - Summary

    By Lucien P. Weber

    Over the last few years, increased customer demands as well as strong competition from substitute materials have accelerated the development of advanced technologies to improve both the performance an

    Jan 1, 1997

  • DFI
    Pile Top Hydraulic Hammer Drive Down The Hole Chiselling Round Steel Piling System - Summary

    By J. Nakayama

    For installation of round steel piles or cast-in-place pile construction through boulder contained ground or rocky formation, usual system does not function properly or impossible to work. This paper

    Jan 1, 1999

  • DFI
    Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, Pa

    GENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA

    Jan 1, 2001

  • DFI
    Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2004

  • DFI
    Slurry Wall Design For Hong Kong Station

    By Stephen T. Young

    The construction of Phase 2 of Hong Kong Station, its retail podium and International Finance Centre Two, the tallest building in Hong Kong, will be completed in the middle of 2003. This paper describ

    Jan 1, 2003

  • DFI
    Damage To Initially Bent Piles ? Synopsis

    By B. B. Broms

    A method for calculating the bending moment induced in misaligned or bent piles is described, The maximum bending moment varies with the angular rotation between the pile segments, the coefficient of

    Jan 1, 2010

  • DFI
    Dynamic And Static Loading Tests Of Piles For Bridges In Surinam - Introduction

    By W. J. van Niekerk

    Ballast Nedam is in Surinam constructing two bridges that will improve communications in the coastal region. The bridges will cross the Coppenam and Surinam rivers and will be founded on open-ended st

    Jan 1, 2000