Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of Iraq

Deep Foundations Institute
H. Meseck
Organization:
Deep Foundations Institute
Pages:
7
File Size:
568 KB
Publication Date:
Jan 1, 1989

Abstract

The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm and pile lengths of 12.0 to 18.0 m. The necessary embedded depth and the bearing capacity thus reached were established on all 600 drives piles by means of dynamic pile tests. For the calibration of the dynamic pile tests, 6 static pile load tests were carried out. The execution of the construction and the results of the extensive tests on the building site are shown.
Citation

APA: H. Meseck  (1989)  Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of Iraq

MLA: H. Meseck Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of Iraq. Deep Foundations Institute, 1989.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account