Pile Top Hydraulic Hammer Drive Down The Hole Chiselling Round Steel Piling System - Summary

Deep Foundations Institute
J. Nakayama
Organization:
Deep Foundations Institute
Pages:
7
File Size:
780 KB
Publication Date:
Jan 1, 1999

Abstract

For installation of round steel piles or cast-in-place pile construction through boulder contained ground or rocky formation, usual system does not function properly or impossible to work. This paper introduces an installation system which combines unique mechanism where the drill is installed on the top of a driving round steel pile or a stand pipe which is initially driven into the overburden to the depth of self-standing. When the pile driving or bore hole drilling encounters hard strata or boulder contained ground, hard material shall be crushed by the down-the-hole chiselling operated in adjustable short stroke and high frequency of blows while cuttings are discharged in reverse circulation through central reverse pipe while round steel pile is simultaneously stroked by a hydraulic hammer. The paper shall explain the mechanism of the system and introduces construction examples for bridge foundation and piled jetty.
Citation

APA: J. Nakayama  (1999)  Pile Top Hydraulic Hammer Drive Down The Hole Chiselling Round Steel Piling System - Summary

MLA: J. Nakayama Pile Top Hydraulic Hammer Drive Down The Hole Chiselling Round Steel Piling System - Summary. Deep Foundations Institute, 1999.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account