Search Documents

  • AUSIMM
    The Geotechnical Input into the Mining Process at George Fisher South Mine

    Geotechnical input is interwoven into the mining process at George Fisher South Mine from the planning and design of working areas to the closure of worked out areas and maintenance of life of mine an

    Nov 25, 2010

  • ISEE
    Control Blasting on the Cross Lake Weir Project

    By George McIvor, Bill Thompson, Don Whitmore, Brad Rhude

    "In 1972 Manitoba Hydro decided to develop the hydro electric potential of the Nelson River. This program included the construction of the Jenpeg Generating Station at the point where the channel of t

    Jan 1, 1992

  • SME
    Geologic Coal Assessment: The Interface With Economics

    By E. D. Attanasi

    Geologic resource assessments describe the location, general characteristics, and estimated volumes of resources, whether in-situ or technically recoverable. Such compilations are only an initial ste

    Jan 1, 2001

  • SME
    Mine Preplanning

    By Christopher J. Bise

    INTRODUCTION Before a mine is planned in detail, a preliminary analysis is often conducted. This preplanning permits the mining engineer to make a rapid assessment as to whether or not a particula

    Jan 1, 1986

  • SME
    Electrophysical Properties, Triboelectric Charge Characteristics And Separation Behaviour Of Calcite, Quartz And Wollastonite Minerals

    By S. Fawell, H. R. Manouchehri

    The main electrophysical properties, i.e., dielectric constant and electrical conductivity, of pure calcite, quartz and wollastonite mineral samples were measured and their triboelectric charge attrib

    Jan 1, 2002

  • NIOSH
    OFR-3-79 Study Of Noise Sources In A Cross Section Of Taconite Plants

    Four taconite plants were studied to establish the extent of hazard to plant personnel which exists based on long-term exposure to noise. The criteria for evaluation include the 90 dBA and 85 dBA summ

    Jan 1, 1977

  • SME
    Borehole Hoisting For Shaft Sinking And Development At Brunswick Mining And Smelting Corporation Limited, Bathurst, New Brunswick

    By W. R. Dengler, R. S. Brown

    In 1974, Brunswick Mining and Smelting Corporation Limited started a 48 million dollar expansion programme at their property in Bathurst, New Brunswick. A portion of the expansion plans includes a 26

    Jan 1, 1976

  • AUSIMM
    Land Reclamation at Waihi û Principles

    By R B. Stewart

    Where pasture production is the intended land use of the areas to be reclaimed, the creation of a suitable growing +medium is a major objective. To achieve this land reclaimers require a sound underst

    Jan 1, 1991

  • AIME
  • AUSIMM
    The Future of Mining on Pitjantjatjara Lands

    In 1976 the Pitjantjatjara Council was established under the Associations Incorporation Act 1985 (SA), for the initial purpose of organising and bringing together three similar Indigenous groups. Thes

    Jan 1, 2002

  • DFI
    Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles

    By John F. MacDonald

    From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn

    Jan 1, 1990

  • CIM
    Typical Reproducibility of Metal Balances in Flotation Plants

    "Each and every flotation plant must produce daily/weekly/monthly production reports in which metal balances for payable and penalising elements are presented. Several factors including ore heterogene

    Jan 1, 2016

  • AUSIMM
    Safety at the Broken Hill Proprietary Steelworks

    By McLennan R. G

    The principle of personal safety is as old as the human race. The application of this principle to industry is of much more recent origin, and may be said to be almost exclusively the product of the t

    Jan 1, 1957

  • NIOSH
    Open-Cut Metal Mining - Introduction

    By E. D. Gardner

    This bulletin, which discusses open-cut mining at the metal mines of the United States, is the last of a series of such papers by the Bureau of Mines describing the principal methods of mining.4 Open

    Jan 1, 1941

  • NIOSH
    RI 3810 Magnetic Surveys of the Florida Peninsula

    By S. J. Hemberger, F. W. Lee, J. H. Swatz

    "INTRODUCTION This investigation was undertaken in 1939 for the purpose of securing the necessary information relating to the field techniques and accuracy that would be needed for magnetically survey

    May 1, 1945

  • SME
    De Beers, Sandvik Team Up On Underground Automation

    De Beers? Finsch diamond mine began operation in the 1960s as a surface project using the latest technology available. During the 1990s, the operation, located about 160 km (100 miles) west of Kimber

    Jan 1, 2008

  • CIM
    Stope Stability Monitoring at the Goldex Mine

    By Patrick Frenette

    The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45

    May 1, 2011

  • NIOSH
    RI 7891 Performance Characteristics of Coal-Washing Equipment: Hydrocyclones

    By Albert W. Deurbrouck

    The performance characteristics of five hydrocyclone coal washers were evaluated to determine the sharpness and efficiency of separation that might be anticipated in commercial operation. The hydr

    Jan 1, 1974

  • IIMP
    Modelo prefabricado para salidas de emergencias en minas subterráneas

    By Roberto Bria

    El presente texto describe el módulo prefabricado para las salidas de emergencia. En este sentido, el sistema modular prefabricado busca facilitar y agilizar la instalación de salidas de emergencia de

    Sep 21, 2013

  • NIOSH
    IC 9118 Face Ventilation For Oil Shale Mining

    By Edward D. Thimons

    This Bureau of Mines report presents expected levels of air pollutants in the face areas of oil shale mines, based upon data collected by the authors and previous investigators. Ventilation requiremen

    Jan 1, 1986