Control Blasting on the Cross Lake Weir Project

- Organization:
- International Society of Explosives Engineers
- Pages:
- 9
- File Size:
- 238 KB
- Publication Date:
- Jan 1, 1992
Abstract
"In 1972 Manitoba Hydro decided to develop the hydro electric potential of the Nelson River. This program included the construction of the Jenpeg Generating Station at the point where the channel of the Nelson River discharged into Cross Lake. The Jenpeg station serves two primary functions: 1) Provides a control structure for the regulation of Lake Winnipeg.2) Acts as a 126,000 kilowatt hydraulic generating station."
Citation
APA:
(1992) Control Blasting on the Cross Lake Weir ProjectMLA: Control Blasting on the Cross Lake Weir Project. International Society of Explosives Engineers, 1992.