Presentation #7 - Bi-Directional Static Load Testing - Load Testing High Capacity Piles What Have We Learned?By Jorj Osterberg
550 load tests of up to 150 MN have been completed on driven and bored piles using the Osterberg Load Cell. Because the test measures side shear and end bearing separately, much can be learned about t
Jan 1, 2001
-
Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A RampBy Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das
Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r
Sep 1, 2022
-
4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. IntroductionBy B. De Paoli
At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e
Jan 1, 1994
-
Unusual Geology At Brooklyn's Edge And Its Influence On Design And Installation Of PilesBy Hiren J. Shah
Across much of New York City, the geology of glacially deposited soils follows a common sequence. Outwash sands generally overlie varved silts and clays, which lie above a basal till deposit underlai
Jan 1, 2008
-
Design Of Self-drilling Micropiles For Permanent ApplicationsBy Racquel Nottingham, Freddy Lopez, Ole Gadermann
The ongoing urban development is a global phenomenon, placing has high demands on urban infrastructure (housing, public services, transportation, telecommunications, etc.). Micropiling is one of the m
-
Calibration of the Gates Pile Driving Equation for LRFD in LouisianaBy Glenn J. Rix, Eduardo Tavera, Raphael Siebenmann, Zhongjie Zhang, Robert C. Bachus, Jongwon Jung
"The Louisiana Department of Transportation and Development (LADOTD) uses a variation of the FHWA-modified Gates equation to verify the nominal pile bearing resistance, typically on smaller projects w
Jan 1, 2017
-
CFA Secant Piling In CaliforniaBy Philip Derbyshire, Dale J. Scheffler
"Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form
Jan 1, 2005
-
The Resonant Driver: Ultra High Frequency Pile And Casing InstallationBy Matthew Janes
The installation of piles and casings is becoming increasingly difficult as restrictions on vibration become common in major urban areas. The use of high frequency, resonant excitation of a pile or c
Jan 1, 2008
-
Osterberg Cell Tests Confirm In-Situ Pier Capacity In Colorado - IntroductionBy William Siegel
Kleinfelder provided foundation analysis and design for an expansion to a cement plant in Florence, Colorado. The expansion was a conversion from a horizontal wet process to a vertical dry process, a
Jan 1, 2007
-
Drilled Piers Support Massive Gantry CraneBy John R. Davie
This paper describes the design and construction of two 5.6 MN capacity drilled piers installed to support the main loading elements of a large cantilevered gantry crane. The critical crane columns we
Jan 1, 2006
-
St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test ProgramBy Jeffrey A. Gebhard
As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes
Jan 1, 2009
-
High Strain Testing Of Large Diameter, High Capacity Unlined Bored Piles ? IntroductionBy Dhanvin B. Mehta
Pile testing is generally understood as static load test. It is our common experience that for high capacity, large diameter bored piles, static testing is expensive and time consuming. It is practica
Jan 1, 1996
-
Challenging Ground Conditons during Flooding Lead to Innovative Deep Foundation Design Process and Load Test EvaluationBy Glen M. Bellew, James F. Mehnert
"The Kansas City District-United States Army Corps of Engineers has completed the design modification of a pile supported floodwall located along the Missouri River in Kansas City, Kansas. This deep f
Jan 1, 2016
-
Reliability Approach For Deep Foundation Studies ? SynopsisBy R. Chowdhury
The relevance of reliability studies for deep foundations is considered in this paper with special reference to pile foundations. Attention is drawn to uncertainties related to applied loads, the load
Jan 1, 2010
-
Dynamic Characterization Of Drilled Shafts On Doremus Avenue BridgeBy Martina Balic
Dynamic properties of the drilled shaft foundations supporting Doremus Avenue Bridge were determined by forced vibration testing. The main objectives of the substructure testing at Doremus Avenue Brid
Jan 1, 2004
-
Installation Of Augered Cast-In-Place Piles - Equipment (66bbaadf-14f6-4860-86d8-a6149d09411b)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 1998
-
Theory And Practice Of Pile Foundations ? SynopsisBy G. G. Meyerhof
The paper reviews the state of the art of estimating the bearing capacity and settlement of pile foundations in sand and clay soils, including the effects of pile installation, scale effects of pile s
Jan 1, 2010
-
The Behavior And Design Of Piled-Raft Foundations Under Lateral LoadingBy Serge Borel
An efficient design method is proposed for "piled-footing" and "piled-raft" foundation under lateral loads. It combines the methods used for the displacement design of shallow and deep foundations and
Jan 1, 2002
-
Fundamental Issues Of Displacement Auger Piling: The European PerspectiveBy Maurice Bottiau
When dealing with displacement auger piling, some general and fundamental issues have to be considered, irrespective of the system. More than with other pile types, the interplay between the soil cond
Jan 1, 2003
-
Session 28 "Modeling and Verification"By Dawn Shuttle
In trying to find a grout, or some kind of stabilizer that would work in this application, we established some performance criteria. Of those, what I controlled the most was viscosity, then I had a wh
Feb 10, 2003