Search Documents

  • SME
    Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, Ohio

    By Narendra N. Khatri, Michael Deutscher, Jozef F. Zurawski

    Five sewer connections were required to divert Combined Sewer Overflow (CSO)from existing outfalls to an old underutilized large diameter brick sewer (the Easterly Interceptor). The connections were p

    Jan 1, 2005

  • SME-ICGCM
    A Management System to Develop Occupational Health & Safety in Ground Control Operations of Underground Mines

    By Kazem Oraee

    Falls of ground have historically been the main cause for fatalities in underground mines. Although recent advances in technology have reduced the number of such accidents, when failures occur they us

    Jan 1, 2012

  • AUSIMM
    The Selection and Management of Contractors

    The mining industry in Australia frequently uses the services of specialist engineering and managing contractors and consultants for a majority of the work required for project development, from fea

    Jan 1, 1990

  • ISEE
    Analytical High-Speed Photography to Evaluate Air Decks, Stemming Retention and Gas Confinement in Presplitting, Reclamation and Gross Notion Applications

    By Mark E. Hammele

    A number of new thoughts have recently emerged concerning the role of air decks, stemming, gas confinement and gross motion in specific blasting environments and applications. Field research in full-s

    Jan 1, 1989

  • NIOSH
    IC 9217 Practical Considerations In Longwall Face And Gate Road Support Selection And Utilization

    By Thomas M. Barczak

    The U.S. Bureau of Mines has been conducting research to optimize the design and utilization of mine roof support systems. An objective of these efforts is to evaluate the mechanical and structural re

    Jan 1, 1989

  • NIOSH
    RI 8676 Chromium Recovery From Nickel-Cobalt Laterite and Laterite Leach Residue

    By D. E. Kirby

    In line with the Bureau of Mines' goal of providing technology to maintain a supply of minerals adequate to meet national economic and strategic needs, a method for recovering chromite from later

    Jan 1, 1982

  • CIM
    Forecasting copper prices in the short and medium terms using geostatistics

    In this paper, geostatistical techniques are applied to forecast the annual copper price in the short and medium terms (from one to five years ahead). These techniques allow the incorporation of month

    Sep 1, 2004

  • CIM
    Forecasting copper prices in the short and medium terms using geostatistics (85ec8f44-0e97-49ec-a0bf-7fb69134cd4d)

    By A. Cabañas

    "In this paper, geostatistical techniques are applied to forecast the annual copper price in the short and medium terms (from one to five years ahead). These techniques allow the incorporation of mont

    Jan 1, 2004

  • SAIMM
    Planning Concept For U/G Works - Overall Planning Concepts Of The Underground Works - Park Station To Marlboro Portal - Summary

    By Philippe Dumont

    ?Lay out of the tunnel section ?General ?Geology ?Tunnels methods ?Stations constraints ?Impacts on tunnels ?Design ?Programs

  • AUSIMM
    Enhancing magnetite concentrate granulation by blending with hematite ore

    By J Addai-Mensah, M Adam, W Skinner, J Begelhole, K Quast

    Granulation of iron ore fines into robust granules is critical to successful sintering and blast furnace operations in iron and steelmaking. Iron and steelmakers desire iron ore granules with high str

    Jul 24, 2017

  • AUSIMM
    Petrographic Evidence Relating to Movement on the Thackaringa-Pinnacles Fault, Broken Hill District

    Although the pattern of metamorphic zones south of the Thackaringa-Pinnacles Fault is much obscured by polymetamorphism, displacement of the orthopyroxene isograd by the fault agrees with the displace

    Jan 1, 1965

  • AUSIMM
    Developments in Diamond Drilling Deflection Equipment and Techniques at Broken Hill South Ltd.

    By Jones S. C

    A specific arc can be cut in hard rock formations using a specially designed multistep piloI bit, variable sized drift joint and long heavy control rod as a stabilizer rather than the Vaughan Thompson

    Jan 1, 1966

  • DFI
    Deep Foundation Construction Using "Top/Down" Building Techniques In The United States

    By David C. Lager

    While not a new construction technique "top/down" construction is seeing increased use in high rise building construction. Using diaphragm wall, drilled shaft and mining construction techniques, top/d

    Jan 1, 1987

  • NIOSH
    OFR-43(3)-77 Mine Fire Protection For Underground Fuel Storage And Transfer Area - Introduction

    It is not uncommon to find large quantities of combustible materials in underground metal and non-metal mines. Support timber is the predominant combustible material. Spontaneous combustion, welding a

    Jan 1, 2011

  • SME
    Downsizing Maintenance to Improve Performance: Defining the Downsizing Task

    By Paul D. Tomlingson

    Editor's note: This is the first of two articles on maintenance. Part two, "Effective maintenance downsizing techniques," will appear in the October issue of MINING ENGINEERING. Most mine mana

    Jan 1, 1994

  • SAIMM
    Design Of Permanent Intruded Plugs At South Deep Gold Mine

    By G. S. Littlejohn

    In anticipation of the flooding of an adjacent dolomitic groundwater compartment, five rough parallel sided boundary plugs at 58 and 50levels have been designed to resist safely hydrostatic heads of 1

    Jan 1, 2006

  • IOM3
    Significance for gold exploration of structural styles of auriferous deposits in the Archaean Bulawayo-Bubi greenstone belt of Zimbabwe

    By P. E. J. Pitfield, S. D. G. Campbell

    The regional structure of shear and deformation zones in the belt, which is recognisable in plan view on Landsat TM images, is interpreted in terms of a conjugate-shear model. Gold mineralisation is r

    Apr 1, 1996

  • NIOSH
    OFR-100(3)-77 Design And Development Of A Machine Familiarization Trainer For Dragline Operators - Phase II Report

    By Peter Murphy

    This report (arid related appendices) provides a description of the functional design specifications, engineering design specifications, and program of instruction for development of a training system

    Jan 1, 1976

  • NIOSH
    RI 8299 Wood Precharring: A Novel Fire-Retardancy Technique

    By Calvin K. Lee

    This Bureau of Mines report describes a simple fire-retardant treatment for wood. The treatment involves preheating the wood surface at high heat flux (~0.6 cal/cm2 sec) to form an in situ surface cha

    Jan 1, 1978

  • NIOSH
    OFR-15-80 Technical And Economic Evaluation Of Underground Disposal Of Coal Mining Wastes

    By M. F. Bucek

    This report summarizes the activities performed and the results achieved during a two-phased investigation of the technical and economic feasibility of disposing of coal mine refuse underground in act

    Jan 1, 1980