Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Automation in Underground Drilling, Loading and Transportation

    By Ulvelin K, Antila K

    Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t

    Jan 1, 1988

  • AUSIMM
    Concentrate Handling Plant of the Broken Hill Associated Smelters Pty. Ltd. At Port Pirie

    By Peck WH

    For many years it was realised that the methods used for unloading concentrates at Port Pirie were inefficient and labour intensive, therefore, when a decision was reached to standardise the east-w

    Jan 1, 1975

  • AUSIMM
    Benchmarks of Performance for Truck and Loader Fleets

    The cost of production from truck and loader fleets is influenced by management development of the culture of the organisation, work practices, systems and procedures of the production and maintenance

    Jan 1, 1992

  • AUSIMM
    Discovery Performance of the Western World Gold Industry Over the Period 1985 - 2003

    This paper summarises the performance of the gold exploration industry in the Western World since 1970, with particular emphasis on the period 1985 - 2003. It identifies the number and size of major (

    Jan 1, 2004

  • AUSIMM
    Crushing and Screening Operations at Bougainville Copper Limited

    By Koginmo V. I

    The concentrator at Bougainville Copper Limited has an annual throughput of 48.2 million tonnes/year producing approximately 175,000 tonnes copper, 16.1 tonnes gold, and 50 tonnes silver. Convention

    Jan 1, 1988

  • AUSIMM
    Convergence and Load Measurements in an Underground Mine in Turkiye

    By Yesil MM, Bozdag T

    This paper describes the conver- gence and load measurements carried out in inclined seams at five longwall faces, two of which were supported by hydraulic props and the other three by conventiona

    Jan 1, 1992

  • AUSIMM
    Metasomatism and Scheelite Mineralization at Bold Head, King Island

    In south-eastern King Island, sediments and lavas of possible Upper Proterozoic to Lower Cambrian age have been intruded by Lower Carboniferous granitic rocks.Within the contact aureole of the Bold He

    Jan 1, 1971

  • AUSIMM
    Recovery of Gold from Refractory Ores and Concentrates Using the Sirosmelt Reactor

    By Floyd J. M

    The recovery of gold from refractory ores and concentrates can be achieved in a number of ways using roasting and leaching procedures. The Sirosmelt system introduces a new approach to the recover

    Jan 1, 1987

  • AUSIMM
    Kinetics and Mechanism of Zircon Chlorination

    By Glastonbury J. R

    The kinetics of the direct chlorination of, zircon in the presence of carbon was studied at temperatures between 9000C and 12000 C. From the experimental data it is prop- osed that the most likely me

    Jan 1, 1973

  • AUSIMM
    The Elimination of Nickel from Zinc Plant Solutions Using Dimethylglyoxime

    By Kershaw M. G, Maughan R. C A

    A process for eliminating nickel from electrolytic zinc plant solutions by precipita- tion with dimethylglyoxime (DMG) was developed to enable the Electrolytic Zinc Company of Australasia Limited (

    Jan 1, 1977

  • AUSIMM
    Performance of Electrodes Containing Brown Coal Char in Alumina Reduction

    By Graham JW, Cullen GV

    edicted increase in, Aluminium production and the possibility of a diminishing supply of petroleum coke for anode electrodes in alumina reduction cells makes it desirable to find alternative electrode

    Jan 1, 1970

  • AUSIMM
    Low Voidage Blasting to Improve Underground Stope Productivity

    Productivity of mines can be improved by taking fewer, but larger blasts. The initial blasts taken in starting a mining block are restricted by the low amount of void or space to fire into. Block cave

    Jan 1, 2008

  • AUSIMM
    An On Line Fragment Size Analyser Using Image Processing Techniques

    By Orid A

    A fast, non-contact technique for measuring sizes of rock fragments on a conveyor belt is presented. An image processing technique called active stereopsis is used which makes use of a light stripe

    Jan 1, 1990

  • AUSIMM
    Calculation of Yields by Weight Drawing of Size Distribution Curves and Separation Curve

    The results of the washing of coal are often presented by using Partition Curves. By analogy, it is possible to express the results of screening by using similar partition curves. As in the coal w

    Jan 1, 1984

  • AUSIMM
    Refining of Clear Copper Powders by the Parker Process: A Comparison of The Chemistry of Copper Impurities in Chloride and Sulfate Media

    By Senanayake G

    A sample of crude copper powder produced by the CLEAR Process was refined by dissolution and recovery in sulfate media using the Parker Process. The Parker Process offers an alternative method of c

    Jan 1, 1984

  • AUSIMM
    Case Study - NWT Diamonds Project

    By Penny T. G

    BHP Diamonds and their joint-venture participants DiaMet Minerals, Chuck Fipke and Stewart Blusson are currently developing Canada's first commercial diamond mine in the arctic barren lands of

    Jan 1, 1997

  • AUSIMM
    Recovery of Copper from Lean-Grade Ores and Intermediate Sources and a New Design of Anode Casting Arrangement for a Small Copper Refinery

    By Chowdhury P. J R, Biswas S. K

    Recovery of metallic values from lean-grade raw materials as well as from secondary/intermediate industrial products is of immense importance to a country like India which is not endowed with extens

    Jan 1, 1992

  • AUSIMM
    Influence of the Sloping of Ground Surfaces on Mine Subsidence

    By Bhattacharyya AK

    A two-dimensional finite element modelling technique is applied to predict the subsidence movements on a sloping ground surface above a completely mined panel. The modelling is carried out for the

    Jan 1, 1992

  • AUSIMM
    The Commissioning of No. 5 Blast Furnace at Port Kembla

    By Warner R. E

    Present capacity for molten iron production at Port Kembla is an average of 13 000 t/day from five blast furnaces. The most recently installed blast furnace, No.5, was commissioned in March 1972 wi

    Jan 1, 1976

  • AUSIMM
    Cost Ranking Studies in the Mining Industry

    Whilst decisions to commit projects have traditionally been heavily influenced by hurdle rates for d.c.f. analysis, it is suggested that evaluation of competitors' costs may be a desirable additi

    Jan 1, 1985