The Commissioning of No. 5 Blast Furnace at Port Kembla

The Australasian Institute of Mining and Metallurgy
Warner R. E
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
14
File Size:
495 KB
Publication Date:
Jan 1, 1976

Abstract

Present capacity for molten iron production at Port Kembla is an average of 13 000 t/day from five blast furnaces. The most recently installed blast furnace, No.5, was commissioned in March 1972 with a design capacity of 4 500 t/day. For the first reline currently scheduled for 1977, plans are being finalized.for significant modifications and uprating of capacity. Achievement of the initial design capacity from No.5 blast furnace on a sustained basis was not realised until the third year of operation. Although the furnace is only 42% larger than No.4 blast furnace on an inner volume basis, the more stringent raw materials, operation and maintenance requirements of the larger furnace and more complex equipment have been found to be much more critical than anticipated in the planning stages. These problems have also been experienced by many other companies who have recently installed large new blast furnaces. Some of the principal problem areas are described together with measures taken to over- come the difficulties. The problem areas include the failure of'the shower cooled bosh, failure of the upper shaft brickwork, sludge
Citation

APA: Warner R. E  (1976)  The Commissioning of No. 5 Blast Furnace at Port Kembla

MLA: Warner R. E The Commissioning of No. 5 Blast Furnace at Port Kembla. The Australasian Institute of Mining and Metallurgy, 1976.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account