Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? SynopsisBy Y. Z. Wang
Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2
Jan 1, 2010
-
Design and Construction of Pile-Supported Mechanicallystabilized-Earth Slope StabilizationBy Nasr Sheta
"After Hurricane Sandy, the stability of an earth slope in the Atlantic Highlands, New Jersey in the United States was deteriorating due to slumping soils and erosion from flooding. A slope stability
Jan 1, 1900
-
Automated Pile Load Test MonitoringBy Joel L. Volterra
Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site
Jan 1, 2008
-
Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling MethodBy Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev
Jan 1, 2015
-
Non-Destructive Testing, Evaluation And Re-Use Of Deep Foundations Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2009
-
Retaining Structure for Berth at KrishnapatnamBy P. V. Chandramohan
"The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as
Jan 1, 2015
-
Alameda Corridor-East: San Gabriel Trench ProjectBy David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
-
Virginia Route 340 Bridges: Challenges in Karst TerrainBy Chaz Weaver, James Sheahan, Michael Mo
"The Virginia Department of Transportation (VDOT) undertook a program to replace four bridges along approximately 4 mi (6.4 km) of US 340 in Northwest Virginia. Two of these bridges, which span Compto
Jan 1, 2017
-
Load Tests On Belled Piles With Polystyrene Foam Between The Shaft And The BaseBy José Carlos A. Cintra
This paper addresses a new experimental procedure to measure the shaft friction and the base resistance of bored piles during static load tests. It is proposed that a set of polystyrene foam discs, pl
Jan 1, 2002
-
Marine Clay Stabilisation Using An Encased Stone Column With Tyre Chips As AggregatesBy Rangaswamy. K, Naga Sivaji
A stone column is one of the most commonly employed methods of ground improvement techniques. This method used to increase the strength, decrease the compressibility of loose granular and finegrained
Nov 1, 2022
-
Providing External Confinement to Precast Prestressed Pile Shafts to Improve Ductility - ·Experimental ObservationsBy Andrew Budek
"Analytical and experimental work has shown that achieving the full inelastic lateral capacity of a pile may require the formation of a plastic hinge below ground level, in the pile shaft. The confini
Jan 1, 2005
-
Vertical Load Test on a Drilled Shaft Installed in Glacially Derived SedimentsBy Robert C. Simpson, Ghada S. Ellithy
"There are several methods for estimating the axial capacity of drilled shafts installed in coarse-grained soils. Most methods estimate the ultimate capacity for side friction and tip resistance. Desi
Jan 1, 2015
-
High Mobility Grouting Prevents Historic Fountain from SinkingBy Brian M. Fraley
"Portions of the Catholic Total Abstinence Fountain in Fairmount Park in Philadelphia, Pa., were in “imminent danger,” according to a restoration services request for proposals (RFP) issued by the Cit
Jan 1, 2017
-
Field and Laboratory Mix Trials for a Deep Soil/Cement/Bentonite Cut-Off Wall Using CSM EquipmentBy Russell J. Denny
"A 25m deep cut-off wall is required for environmental remediation of a Former Chlor-Alkali Plant. Extensive trials were conducted to verify the effectiveness of the mixes proposed, with the requireme
Jan 1, 2015
-
Laboratory Modeling of Internal Erosion in Dam FoundationsBy Kenneth E. Henn, David B. Paul, John D. Rice, Brian H. Greene
"Several laboratory modeling programs have been conducted to investigate the mechanisms associated with internal erosion of dam embankments and foundations. The investigation consists of developing l
Jan 1, 2016
-
A Study Of Aspects Of The Historical Development Of Geotechnical EngineeringBy Thomas J. Kennedy, Michael D. Bennett
The study of geotechnical history is well-established. Most geotechnical practitioners, teachers, and graduate students have some grasp of the origins of the field. However, this understanding often c
Oct 1, 2022
-
Strain Gauge Interpretation Using Automated Collection Systems and the Accuracy of Using Extrapolated Modulus vs Constant Modulus of a Pile, Along With the Importance of a Detailed QA/QC ProgramBy Michael A. McNicholas
"Deep foundations utilize the varying soil conditions to provide the most cost-effective or practical scope for a given jobsite. Once the scope has been determined and the engineering applied, the ele
Jan 1, 2017
-
Experiences Using A Leader System For Long Cfa(Acip) Piles In HawaiiBy Damien Enright, Franz-Werner Gerressen
CFA/ACIP pile is the most used single pass drilling method for deep foundation installations. It is constructed by rotating and driving a Continuous Flight Auger (CFA) into the ground at a controlled
Oct 1, 2022
-
Centrifuge Modelling Of Displacement Piles and Installation EffectsBy J. Gniel, L. King, C. Gaudin, C. O’Loughlin
"This paper presents some recent advancements in centrifuge modelling, which enable the installation of displacement piles to be performed in-flight while measuring ground responses. Details and resul
Jan 1, 1900
-
Design and Construction of Nysted Offshore Wind Farm, DenmarkBy Jørn Thomsen, Christoffer Brodbaek
"As governments increasingly accord high priority to sustainable energy, policymakers are finding that wind energy has a long track record as a proven alternative to conventional energy supply.Over th
Jan 1, 2009