Alameda Corridor-East: San Gabriel Trench Project

- Organization:
- Deep Foundations Institute
- Pages:
- 4
- File Size:
- 4736 KB
- Publication Date:
- Jan 1, 2017
Abstract
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation including a 1.4 mi (2.3 km) long trench that will allow Union Pacific Railroad (UPRR) and Amtrak passenger trains to operate below ground through the city of San Gabriel, Calif. The project is necessary as the ACE trade corridor accommodates approximately 60% of the shipping containers that move from San Pedro Bay, the busiest port facility in the western hemisphere, to the rest of the country via an extensive rail network. Rail traffic is expected to increase by as much as 160% by 2020, and the resultant delays to vehicular traffic is projected to increase by an estimated 300%. The San Gabriel Trench Project is designed to mitigate the effects of this increased train and vehicle traffic throughout the San Gabriel Valley. Malcolm Drilling Company (Malcolm) was selected by Walsh to perform the specialty foundation and ground improvement work for the San Gabriel Trench.This project is part of ACE’s program to create 22 grade separations and safety improvements at 39 grade crossings throughout the San Gabriel Valley. In addition to safety improvements that will eliminate crossing collisions and delays to emergency responders, the project will reduce vehicle congestion and emissions from passenger cars and trucks having to wait for passing trains, and the project will also reduce locomotive horn and crossing bell noise to local residents.Construction of this portion of the project began in late 2012, and it is scheduled to be completed by the end of 2017, having created approximately 9,000 jobs during this period. The project is being funded from Proposition 1B transportation bonds approved by California in 2006, the Metropolitan Transportation Authority (MTA) Measure “R,” and other local and federal funds. The overall project cost is estimated to be $313 million."
Citation
APA:
(2017) Alameda Corridor-East: San Gabriel Trench ProjectMLA: Alameda Corridor-East: San Gabriel Trench Project. Deep Foundations Institute, 2017.