Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? Synopsis

- Organization:
- Deep Foundations Institute
- Pages:
- 6
- File Size:
- 687 KB
- Publication Date:
- Jan 1, 2010
Abstract
Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2.20 m with a length of approximately 65 m. This paper attempts, through the introduction of the said bridge's footing pile design and construction, mainly to give an account of the following points: 1) experiment and research on deep friction pile with a large diameter, 2) calculation of vertical carrying capacity of the pile with a large diameter, 3) analysis of horizontal forces the footing-piles of the column-shaped piers, 4) application of normal and reverse-circulation rotary drilling technologies to the construction of bored cast-in-place concrete piles with a large diameter and 5) applying super-sonic impulse on destruction detective device to examine the quality of the pile concrete.
Citation
APA:
(2010) Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? SynopsisMLA: Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? Synopsis. Deep Foundations Institute, 2010.