Realization Of An Innercity Car Park By Means Of A Complex Underpinning MeasureBy Robert Thurner
The underground car park "Admonterhof in the historical centre of Graz is an example for the technical and economical success of a complicated structural design using a concept on the basis of the obs
Jan 1, 2006
-
Design and Installation of Helical Piles for Support of Bridge Pier FoundationBy David L. Borusiewicz, M. Suri Surendra
"Abstract Helical piles have been used as anchors and for supporting lightly loaded structures as a method of underpinning, etc in the past. Recently, helical piles are being used to support new struc
Jan 1, 2014
-
Nonlinear Spring Functions For 3-D Seismic Responses Of Structures On PilesBy Nien-Yin Chang
The contemporary seismic response analysis of structures using a finite element analysis code requires six elastic spring constants to address the six degrees of freedom ground/foundation contribution
Jan 1, 2007
-
Conference Papers - Conference Papers: Session 1 - Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora ProjectBy H. Boghosian
This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w
Jan 1, 2006
-
Augered Cast-In-Place Pile Manual (Model Specification with Commentary)"Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst
Jan 1, 2016
-
Design Of The BMIP Boat Section - IntroductionBy Kenneth Pidgeon
The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.
Jan 1, 1994
-
Behavior Of Excavation And Pile Foundations In Soft Bankok ClayBy D. T. Bergado
The uppermost subsoil profiles of the Bangkok plain can be divided into four layers, namely: weathered clay, soft clay, stiff clay, and dense sand layers. The soft Bangkok clay is a normally consolida
Jan 1, 2010
-
Load In A Drilled Foundation. Where Did It Go And When Did It Get There?By Walter E. Vanderpool
Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.
Jan 1, 2004
-
-
Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load TestsBy Jesús E. Gómez
This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa
Jan 1, 2008
-
Consultants Can Be Safe, Too – A Collaborative ApproachBy Brian FitzPatrick, Michael J. Weaver
Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration
Jan 1, 2019
-
Söderströmstunneln – An Immersed Tunnel Founded on Steel Core PilesBy Frank Haehnig, Kjell-Åke Averstad, Johannes Glückert
"AbstractThe Söderströmstunneln is part of the Citybanan project that is currently under construction in the centre of Stockholm. Main part of the lot Söderströmstunneln is a 300m long immersed tunnel
Jan 1, 2014
-
Holding Back The Watchung MountainsBy Ryan C. Linthicum
A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains
Jan 1, 2003
-
Dynamic Testing For Bored Pile Bearing Capacity - SummaryBy Jörn M. Seitz
Dynamic load testing is employed with ever increasing frequency to estimate the strength and elastic settlement behavior of piles of all types. For dynamic loading ram masses up to 20 Mg have been use
Jan 1, 1987
-
Construction Productivity Advancement Research Program (CPAR)By Jesse A. Pfeiffer
CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati
Jan 1, 1989
-
Tied-Back Micropile Walls In Landslide RepairBy Kevin W. Cargill
In September 2004, Hurricanes Frances and Ivan caused the Pigeon River in western North Carolina to flood. This flooding eroded the embankment below Interstate 40 (I-40) and sent one of the eastbound
Jan 1, 2006
-
Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure SitesBy John P. Davis
The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s
Jan 1, 2006
-
Pile Design, Testing, And Installation For A Gated Dam ? SynopsisBy B. H. Moore
The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori
Jan 1, 2010
-
A Cut And Cover In Stiff Clay In Eurre-France - SynopsisBy R. Stenne
This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly
Jan 1, 2000
-
Recent Experience With The Omega Pile And New Applications - SynopsisBy Maurice Bottiau
The recent evolution of the piling market clearly shows a growing demand for screw piles with soil displacement. The recently developed Omega Screw pile ful-fill these new expectations, combining the
Jan 1, 1996