Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    The Use of Controlled Modulus Column (CMC) Ground Improvement for Support of Large Warehouses

    By Brandon T. Buschmeier, Sonia S. Swift, Michael P. Walker, Frederic Masse

    "Ground improvement has undoubtedly become a cost-efficient and effective solution to support the development of poor soil sites. Ground improvement elements, such as Controlled Modulus Columns (CMCs)

    Jan 1, 2017

  • DFI
    Piled Foundations for the New Wembley Stadium, London

    By Anthony L. Reynolds, Clifford J. Wren

    "The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable

    Jan 1, 2005

  • DFI
    Behavior Of Piled Raft Foundation Systems Under A Combined Set Of Loadings

    By Renato P. Cunha

    The paper explores a parametric analysis of a four-pile group in contact (hence piled raft) and without contact (hence standard pile group) with the superficial soil layer, under a combined set of loa

    Jan 1, 2006

  • DFI
    Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle East

    By Brian Metcalfe, Kord Wissmann, Gianni Martinez

    The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large

    May 1, 2022

  • DFI
    Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method (71db6e71-57a4-4d54-81bc-d746d501291d)

    By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki

    "The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX

    Jan 1, 2015

  • DFI
    Mobilised Shear Strength on the Failure Surface of 2D Belled Anchor Model Piles under Uplift in Cohesionless Soil

    By Tanaya Deb, Sujit Kumar Pal

    "Experimental investigations are carried out on failure pattern around 2D models of belled anchor piles in dry sand bed of density 15.60 kN/m3 under uplift. The models are having thickness ratio (Ts/T

    Jan 1, 2015

  • DFI
    Structural Aspects Of The Stabilization Of Ten Mile Slide

    By Adrian Gygax, Sarah Gaib, Rod Kostaschuk

    The British Columbia Ministry of Transportation and Infrastructure (Ministry) recently completed a slope stabilization project at Ten Mile Slide on Highway 99. The highway is an essential part of the

    Oct 1, 2022

  • DFI
    St. Croix Bridge, Minnesota: The Influence of Construction on the Axial Resistance of Drilled Shaft Foundations in Weak Sandstone

    By William G. Ryan, David S. Graham, Dan A. Brown, Rich A. Lamb, Paul J. Axtell

    "The St. Croix River Crossing project on the Minnesota-Wisconsin border has been in the process of planning and public debate for two decades, with several changes in alignment. During the course of t

    Jan 1, 2015

  • DFI
    Effects of Deep Mixing Method to Reinforce Earth Levees in the Mekong Delta, Vietnam

    By Bao K. Le, Khang T. Truong, Masaki Kitazume, Toru Kobayshi, Long P. Le, Tanaka Hitoshi, Makoto Kamimura, Hoang-Hung Tran-Nguyen

    "Earth levees constructed using dredged materials taken from a river along an earth levee have annually damaged in the Mekong Delta due to high void spacing in earth levees and floodwater. Sliding and

    Jan 1, 2015

  • DFI
    Ductile Iron Pile Foundation Solution for Interior Retrofit Projects

    By Keithe J. Merl, Brendan FitzPatrick, Gregg Piazza

    Urban and industrial construction projects commonly involve interior work within buildings, warehouses and manufacturing facilities. Renovations of these existing structures must address both structur

    Jan 1, 2019

  • DFI
    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    Analysis And Performance Of Sheet Pile Cofferdam Under Demolition Blast Loads

    By Michael Oakland

    This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn

  • DFI
    Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast Loads

    By John Mould, Gordon Chen, Michael Oakland, William McElwee

    "This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn

    Jan 1, 2017

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Effects Of Change In The Support System On Temporary Secant Pile Wall

    By Anburaj C., Srinivas A.

    Deep excavation with support system is required to construct various part of underground structures like shafts, stations and entry structures etc. These structures have to be constructed using perman

    Nov 1, 2022

  • DFI
    A Fully Connected Jobsite is a Must for the Future

    By Christian Hoyme, Jochen Maurer

    Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital

    Jan 1, 2019

  • DFI
    Broadway Viaduct Design Phase Load Test Program For Post Grouted Shafts

    By Mike Muchard

    A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc

    Jan 1, 2009

  • DFI
    Soil Mixing Monitoring System Quality Control for the SR-83 Project in Florida

    By Danny Winters, Wesley Schmutzler, Christopher Lewis, Matteo Bertoni

    "SR 83/US 331 is a primary North/South roadway in Walton County that is a crucial link for tourism and commerce between the Walton County beaches and the heavily traveled I-10 corridor in the panhandl

    Jan 1, 2017

  • DFI
    Underpinning Using Long Minipiles In Compressible Soils

    By Mohamad H. Hussein

    A minipile system was employed in underpinning a historical structure in Florida. The existing structure is founded on shallow foundations. Subsurface conditions at the project site consist of deep or

    Jan 1, 1993

  • DFI
    Comparative Study On Numerical Analysis Of Laterally Loaded Pile

    By Tiruvengala Padma, Nilesh Naik

    Piles are common type of deep foundation elements used for the special bridges, transmission towers, Jetties, and tall structures. Lateral loads on the structures can be due to either earth pressures,

    Sep 1, 2022